|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 10/1/2019 Measured TD: 2620 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 10/1/2019 | Wellbore Permit | | Permit #: | 20020064 | Expiration Date: | 1/8/2003 | Proposed Depth/Form: | 2600 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | Unit: | | Unit Number: | | Formation And Spacing: | Code: FRLDC , Formation: FRUITLAND COAL , Order: 112-156 , Unit Acreage: , Drill Unit: W/2 | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 200 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 6/6/2002 | Spud Date: | 4/8/2002 | Spud Date Is: | ACTUAL | Measured TD: | 2620 ft. | Measured PB depth: | 2567 ft. | True Vertical TD: | | True Vertical PB depth: | | Top PZ Location: | Sec: Twp: | Footage: FL FL | Bottom Hole Location: | Sec: Twp: | Footage: | Log Types: | 1. GRCBL, 2. AI, 3. COMPENSATED NEU TRIPLE LITHO-DEN | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 455 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 330, Top: 0 ft., Bottom: 455 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2611 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 450, Top: 0 ft., Bottom: 2611 ft., Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | FRUITLAND COAL | 2087 ft. | 2512 ft. | N | N | PICTURED CLIFFS | 2512 ft. | | N | N |
Formation FRLDC Formation Classification: GW Status: PR - 10/1/2019 Interval Top: 2130 ft. Interval Bottom: 2264 ft. Completed Information for Formation FRUITLAND COAL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FRUITLAND COAL | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/6/2002 | Treatment Summary: | ACIDIZED FRUITLAND COALS W/ 1,475 GALS 15% HCL W/ ADDITIVES, FRACTURE STIMULATE FRUITLAND COALS DOWN 5 1/2" CSB W/ 106,276 GALS 20# DELTA FRACFLUID WITH SANDWEDGE CONTAINING 284486# 12/20 OTTOWASAND// RAN CBL/ GR/CCL FROM 2060' TO SURFACE W/ 1000# ON CSG. PERFED 2461-2466" W/ 4" CSG GUN, 4 SPFS, 20 HOLES, 0.42 DIS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/15/2003 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | COAL GAS | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 350 | CASING_PRESS | 170 | MCF_GAS | 259 | TUBING_PRESS | 170 |
| Perforation Data: | Interval Top: | 2130 ft. | # Of Holes: | 356 | Interval Bottom: | 2264 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 64107 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 30.192 |
Average MCFE per Day | 175.129 |
Federal Financial Assurance | i | Y |
|
|