Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-067-08627
Well Classification: CBM Status: PR - 11/25/2014
Well Name/No:SOUTHERN UTE 14-02 #2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SIMCOE LLC - 10749
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:14200614
Facility Status:PRStatus Date11/25/2014
FacilityID:261228LocationID:326648
County:LA PLATA #067Location:NWSW 14 33N11W N
Field:IGNACIO BLANCO - #38300Elevation:7020 ft.
Planned Location:1550FSL  1215 FWLLat/Long: 37.101548 / -108.016732Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 37.101634 / -108.016821Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 11/25/2014             Measured TD: 3421 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 11/25/2014
Wellbore Permit
Permit #:011716 Expiration Date:9/17/2002
Prop Depth/Form:3463 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:INDIANSurface Owner:INDIAN
Unit: Unit Number: 
Formation And Spacing:Code: FRLDC , Formation: FRUITLAND COAL , Order: 112-157 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:6/16/2002
Spud Date:6/3/2002Spud Date Is:ACTUAL
Measured TD:3421 ft.Measured PB depth:3421 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SUBMITTED BY LOGGER
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 362 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 170, Top: 0 ft., Bottom: 362 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 3042 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 470, Top: 0 ft., Bottom: 3042 ft., Determination Method:
Casing:String Type: 1ST LINER, Hole Size: 8.75 in., Size: 5.5 in., Top: 2963 ft., Depth: 3421 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
FRUITLAND3060 ft.NN
FRUITLAND COAL3060 ft.3413 ft.NN

Formation FRLDC                   Formation Classification:  CBM                   Status:  PR - 11/25/2014                Interval Top: 3128 ft.    Interval Bottom: 3409 ft.

 Completed Information for Formation FRUITLAND COAL
1st Production Date:N/AChoke Size: 
Formation Name:FRUITLAND COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/25/2014Treatment End Date:N/A
Treatment Summary:11/17/14: Perf'd 3 intervals in the tubing and liner from 3204'-3332'; 144 shots .22 in diameter
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/26/2006
Treatment Summary:CLEAN OUT WELL WITH AIR & FOAM. PERFORATE: 3128'-3158'-3168', 3204'-3217',3266'-3270',3272' -3287', 3313'-3317',3324'-3326', 3330'-3332',3394'-3409' WITH 4 JSPF SET LINER HANGER AND RUN LINER WITH TOP@2693'&BOTTOM OF LINER@3421', TIH WITH 2 3/8" & LAND @
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BTU_GAS 915
CASING_PRESS 178
MCF_GAS 380
TUBING_PRESS 162
Perforation Data:
Interval Top:3128 ft.# Of Holes:448
Interval Bottom:3409 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)6394
GOR
GOR DeterminationMCFE
Average BOE per Day3.017
Average MCFE per Day17.456

 Federal Financial Assurance  i 

 Tribal Well  i Yes