|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 11/25/2014 Measured TD: 3421 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 11/25/2014 | Wellbore Permit | | Permit #: | 011716 | Expiration Date: | 9/17/2002 | Prop Depth/Form: | 3463 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | INDIAN | Surface Owner: | INDIAN | Unit: | | Unit Number: | | Formation And Spacing: | Code: FRLDC , Formation: FRUITLAND COAL , Order: 112-157 , Unit Acreage: 320, Drill Unit: S/2 |
| | |
Wellbore Completed | Completion Date: | 6/16/2002 | Spud Date: | 6/3/2002 | Spud Date Is: | ACTUAL | Measured TD: | 3421 ft. | Measured PB depth: | 3421 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | SUBMITTED BY LOGGER | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 362 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 170, Top: 0 ft., Bottom: 362 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 3042 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 470, Top: 0 ft., Bottom: 3042 ft., Determination Method: | Casing: | String Type: 1ST LINER, Hole Size: 8.75 in., Size: 5.5 in., Top: 2963 ft., Depth: 3421 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | FRUITLAND | 3060 ft. | | N | N | FRUITLAND COAL | 3060 ft. | 3413 ft. | N | N |
Formation FRLDC Formation Classification: CBM Status: PR - 11/25/2014 Interval Top: 3128 ft. Interval Bottom: 3409 ft. Completed Information for Formation FRUITLAND COAL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FRUITLAND COAL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 11/25/2014 | Treatment End Date: | N/A | Treatment Summary: | 11/17/14: Perf'd 3 intervals in the tubing and liner from 3204'-3332'; 144 shots .22 in diameter | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 6/26/2006 | Treatment Summary: | CLEAN OUT WELL WITH AIR & FOAM. PERFORATE: 3128'-3158'-3168', 3204'-3217',3266'-3270',3272' -3287', 3313'-3317',3324'-3326', 3330'-3332',3394'-3409' WITH 4 JSPF SET LINER HANGER AND RUN LINER WITH TOP@2693'&BOTTOM OF LINER@3421', TIH WITH 2 3/8" & LAND @ |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BTU_GAS | 915 | CASING_PRESS | 178 | MCF_GAS | 380 | TUBING_PRESS | 162 |
| Perforation Data: | Interval Top: | 3128 ft. | # Of Holes: | 448 | Interval Bottom: | 3409 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 6394 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 3.017 |
Average MCFE per Day | 17.456 |
Federal Financial Assurance | i | |
|
|