Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-067-06016
Well Classification: CBM Status: PR - 10/1/2018
Well Name/No:SOUTHERN UTE #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:HILCORP ENERGY COMPANY - 10133
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:14-20-151-57
Facility Status:PRStatus Date10/1/2018
FacilityID:214415LocationID:325257
County:LA PLATA #067Location:SENW 35 33N9W N
Field:IGNACIO BLANCO - #38300Elevation:7341 ft.
Basin:SAN JUAN BASIN  
Planned Location:1330FNL  1530 FWLLat/Long: 37.063959 / -107.799146Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 37.064000 / -107.798390Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 10/1/2018             Measured TD: 8661 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 10/1/2018
Wellbore Permit
Permit #:19680557 Expiration Date:12/26/1969
Proposed Depth/Form:8850 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:INDIANSurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 0 , Unit Acreage: 640, Drill Unit: ALL
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: 0 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: PCCF , Formation: PICTURED CLIFFS , Order: 0 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:2/27/1969
Spud Date:12/30/1968Spud Date Is:ACTUAL
Measured TD:8661 ft.Measured PB depth:8652 ft.
True Vertical TD:True Vertical PB depth:
Log Types:IND;FDC;SNP;CBL-CORR.
Casing:String Type: SURF, Hole Size: 15 in., Size: 10.75 in., Top: 0 ft., Depth: 277 ft., Weight: 32.75 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 277 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 4399 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 910, Top: 2670 ft., Bottom: 4399 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: 6.75 in., Size: 5.5 in., Top: 4145 ft., Depth: 8660 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 4125 ft., Bottom: 8660 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
CLIFF HOUSE5630 ft.
MENEFEE6020 ft.
POINT LOOKOUT6310 ft.
MANCOS6460 ft.
GREENHORN8396 ft.
DAKOTA8565 ft.

Formation DKTA                     Formation Classification:  GW                     Status:  AB - 10/7/2009                 Interval Top: 8570 ft.    Interval Bottom: 8644 ft.

 Completed Information for Formation DAKOTA
1st Production Date:9/10/1969Choke Size: 
Formation Name:DAKOTACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/27/1969
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
MCF_GAS 3362
TUBING_PRESS 270
Perforation Data:
Interval Top:8570 ft.# Of Holes:37
Interval Bottom:8644 ft.Hole Size:

Formation MVRD                     Formation Classification:  GW                     Status:  AB - 10/7/2009                 Interval Top: 6052 ft.    Interval Bottom: 6360 ft.

 Completed Information for Formation MESAVERDE
1st Production Date:9/10/1969Choke Size: 
Formation Name:MESAVERDECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/27/1969
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
CASING_PRESS 704
MCF_GAS 1479
TUBING_PRESS 119
Perforation Data:
Interval Top:6052 ft.# Of Holes:120
Interval Bottom:6360 ft.Hole Size:

Formation PCCF                     Formation Classification:  GW                     Status:  PR - 10/1/2018                 Interval Top: 3953 ft.    Interval Bottom: 4011 ft.

 Completed Information for Formation PICTURED CLIFFS
1st Production Date:11/19/1986Choke Size: 
Formation Name:PICTURED CLIFFSCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/27/1969
Treatment Summary:SEE SCANNED DOCUMENT 00668845
Tubing Size:1.25 in.Tubing Setting Depth:4490 ft.
Tubing Packer Depth:4485 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation PCCF.
Perforation Data:
Interval Top:3953 ft.# Of Holes:31
Interval Bottom:4011 ft.Hole Size:0.34 in.

Formation FRLDC                   Formation Classification:  GW                   Status:  PR - 10/1/2018                 Interval Top: 3814 ft.    Interval Bottom: 3899 ft.

 Completed Information for Formation FRUITLAND COAL
1st Production Date:4/10/2001Choke Size: 
Formation Name:FRUITLAND COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/27/1969
Treatment Summary:BULLHEAD 2000 GAL. 15% HCL ACID AHEAD OF FRAC FRAC W/205,000 LBS. 20/40 SAND IN 85,800 GAL 25# X-LINKED GEL W/SANDWEDGE, AIP 5000 PSI, AIR 47.0 BPM,ISIP 1702 PSI.
Tubing Size:2.375 in.Tubing Setting Depth:6293 ft.
Tubing Packer Depth:6373 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FRLDC.
Perforation Data:
Interval Top:3814 ft.# Of Holes:107
Interval Bottom:3899 ft.Hole Size:0.45 in.

Formation PC-MV                   Formation Classification:  GW                   Status:  CM - 11/30/1994

 Completed Information for Formation PICTURED CLIFFS-MESAVERDE
1st Production Date:11/30/1994Choke Size:304.000 in.
Formation Name:PICTURED CLIFFS-MESAVERDECommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation PC-MV.
No Perforation Data was found for formation PC-MV.

Formation PCMDK                   Formation Classification:  GW                   Status:  CM - 4/10/2001

 Completed Information for Formation PICT CLIFFS-MESAVERDE-DAK
1st Production Date:4/10/2001Choke Size: 
Formation Name:PICT CLIFFS-MESAVERDE-DAKCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation PCMDK.
No Perforation Data was found for formation PCMDK.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)60714
GOR
GOR DeterminationMCFE
Average BOE per Day28.696
Average MCFE per Day166.451

 Federal Financial Assurance  i 

 Tribal Well  i Yes