|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 1/1/2023 Measured TD: 17510 ft. Vertical TD: 6736 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 1/1/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/5/2025 | | Proposed Top PZ Location: | Sec:6 Twp: 6N 80W | Footage: 147 FSL 759 FWL | | Bottom Hole Location: | Sec:31 Twp: 7N 80W | Footage: 100 FNL 734 FWL | | Proposed Depth/Form: | 17834 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 531-63 , Unit Acreage: 1837, Drill Unit: 7N80W Section 31: AL | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 190, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2400 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 673, Top: 0 ft., Bottom: 2400 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 8.5 in., Top: 0 ft., Depth: 17834 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 3118, Top: , Bottom: 17834 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/11/2022 | | Spud Date: | 9/30/2022 | Spud Date Is: | ACTUAL | | Measured TD: | 17510 ft. | Measured PB depth: | 17450 ft. | | True Vertical TD: | 6736 ft. | True Vertical PB depth: | 6738 ft. | | Top PZ Location: | Sec:6 Twp: 6N 80W | Footage: 70 FSL 812 FWL | | Bottom Hole Location: | Sec:31 Twp: 7N 80W | Footage: 191 FNL 687 FWL | | Log Types: | RCBL, MWD
| | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 0 ft., Bottom: 90 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2412 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 633, Top: 0 ft., Bottom: 2412 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 17496 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2795, Top: 5091 ft., Bottom: 17496 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | HYGIENE | 2546 ft. | | N | N | | PIERRE | 3487 ft. | | N | N | | SUSSEX | 4584 ft. | | N | N | | SHANNON | 5216 ft. | | N | N | | PIERRE A | 5234 ft. | | N | N | | NIOBRARA | 6838 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 1/1/2023 Interval Top: 6837 ft. Interval Bottom: 17397 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/25/2022 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 10/31/2022 | Treatment End Date: | 11/25/2022 | | Treatment Summary: | Acid = 1132 bbl 15% HCl
Freshwater = 411,671.12 bbl slickwater + 45,195.6 bbl Hybor G 25# + 17,013 bbl treated water = 473,879.72 bbl
Proppant = 10,178,580 lbs 30/50 Premium white sand
Flowback volume of produced water was metered, recorded and reported for 23 days, after which the well was turned over to production operations | | Total fluid used in treatment (bbls): | 475012 | Max pressure during treatment (psi): | 9941 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 47 | | Total acid used in treatment (bbls): | 1132 | Min frac gradient (psi/ft): | 0.77 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 7098 | | Fresh water used in treatment (bbls): | 473880 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 10178580 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6854 ft. | | Tubing Packer Depth: | 6856 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/1/2023 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 322 | | BBLS_OIL | 155 | | BTU_GAS | 1339 | | CALC_BBLS_H2O | 322 | | CALC_BBLS_OIL | 155 | | CALC_GOR | 542 | | CALC_MCF_GAS | 84 | | CASING_PRESS | 1600 | | GRAVITY_OIL | 37 | | MCF_GAS | 84 | | TUBING_PRESS | 1075 |
| | Perforation Data: | | Interval Top: | 6837 ft. | # Of Holes: | 2466 | | Interval Bottom: | 17397 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 58540 |
| Total Gas Produced (MCF) | 146578 |
| GOR | 2503 |
| GOR Determination | BOE |
| Average BOE per Day | 229.783 |
| Average MCFE per Day | 1332.740 |
| Federal Financial Assurance | i | Y |
|
|