|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 3/1/2024 Measured TD: 18121 ft. Vertical TD: 7108 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 3/1/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 12/27/2020 | | Proposed Top PZ Location: | Sec:29 Twp: 8N 80W | Footage: 970 FSL 1087 FWL | | Bottom Hole Location: | Sec:17 Twp: 8N 80W | Footage: 280 FSL 1174 FWL | | Proposed Depth/Form: | 20553 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | Peterson Ridge | Unit Number: | COC075018X | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 531-47 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 63, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2400 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 630, Top: 0 ft., Bottom: 2400 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 20553 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2300, Top: , Bottom: 20553 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/16/2019 | | Spud Date: | 3/13/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 18121 ft. | Measured PB depth: | 18069 ft. | | True Vertical TD: | 7108 ft. | True Vertical PB depth: | 7118 ft. | | Top PZ Location: | Sec:29 Twp: 8N 80W | Footage: 970 FSL 1087 FWL | | Bottom Hole Location: | Sec:17 Twp: 8N 80W | Footage: 280 FSL 1174 FWL | | Log Types: | CBL, MWD/LWD, Mud (Triple Combo in 05-057-06613) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 115 ft., Weight: 94 , Citings Type: ACTUAL | | Cement: | Sacks: 90, Top: 0 ft., Bottom: 115 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2403 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 695, Top: 0 ft., Bottom: 2403 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 18114 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 3005, Top: 450 ft., Bottom: 18114 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | LANCE | 3460 ft. | | | | | FOX HILLS | 4217 ft. | | | | | PIERRE | 4685 ft. | | | | | SUSSEX | 5368 ft. | | | | | SHANNON | 5921 ft. | | | | | MANCOS | 7263 ft. | | | | | NIOBRARA | 7559 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 3/1/2024 Interval Top: 8255 ft. Interval Bottom: 17964 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/23/2019 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/1/2019 | Treatment End Date: | 8/5/2019 | | Treatment Summary: | Cemented Monobore- Plug and Perf- Frac Initiation Sleeve job containing 42 stages, all stimulated with water, acid, and proppant; 1,021 bbls of 15% NEFE HCL Acid, 294,420 bbls of total freshwater, totaling 295,441 bbls of fluid used and 1,504,040 lbs of 40/70 proppant and 13,086,000 lbs of 20/40 proppant. | | Total fluid used in treatment (bbls): | 295441 | Max pressure during treatment (psi): | 8485 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 42 | | Total acid used in treatment (bbls): | 1021 | Min frac gradient (psi/ft): | 0.74 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 54615 | | Fresh water used in treatment (bbls): | 294420 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 14590040 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7786 ft. | | Tubing Packer Depth: | 7780 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/13/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | FLARED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 959 | | BBLS_OIL | 505 | | BTU_GAS | 1456 | | CALC_BBLS_H2O | 959 | | CALC_BBLS_OIL | 505 | | CALC_GOR | 598 | | CALC_MCF_GAS | 302 | | CASING_PRESS | 810 | | GRAVITY_OIL | 38 | | MCF_GAS | 302 | | TUBING_PRESS | 405 |
| | Perforation Data: | | Interval Top: | 8255 ft. | # Of Holes: | 1344 | | Interval Bottom: | 17964 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2251 |
| Total Gas Produced (MCF) | 4854 |
| GOR | 2156 |
| GOR Determination | BOE |
| Average BOE per Day | 8.469 |
| Average MCFE per Day | 49.101 |
| Federal Financial Assurance | i | Y |
|
|