Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-057-06603
Well Classification: OW Status: PR - 6/1/2024
Well Name/No:Janet 0780 #1-16H21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:FULCRUM ENERGY OPERATING LLC - 10805
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2024
FacilityID:452319LocationID:439603
County:JACKSON #057Location:NWNW 16 7N80W 6
Field:NORTH PARK HORIZONTAL NIOBRARA - #60120Elevation:8127 ft.
Basin:NORTH PARK BASIN  
Planned Location:203FNL  192 FWLLat/Long: 40.584150 / -106.387330Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.584152 / -106.387331Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/11/2018
End Date: 6/24/2018
Reported: 7/20/2018
Days to report: 26
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2024             Measured TD: 17370 ft.    Vertical TD: 7045 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/25/2019
Proposed Top PZ Location:Sec:16 Twp: 7N 80W Footage: 1347 FNL  449 FWL
Bottom Hole Location:Sec:21 Twp: 7N 80W Footage: 87 FSL  382 FWL
Proposed Depth/Form:17846 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 531-52 , Unit Acreage: 1281, Drill Unit: W/2 Sec 4, 9, 16, 21
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16.25 in., Top: 0 ft., Depth: 90 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 189, Top: 0 ft., Bottom: 90 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2400 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 629, Top: 0 ft., Bottom: 2400 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 17846 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 3040, Top: , Bottom: 17846 ft.

Wellbore Completed
Completion Date:3/29/2018
Spud Date:1/30/2018Spud Date Is:ACTUAL
Measured TD:17370 ft.Measured PB depth:17223 ft.
True Vertical TD:7045 ft.True Vertical PB depth:7066 ft.
Top PZ Location:Sec:16 Twp: 7N 80WFootage: 1347 FNL  449 FWL
Bottom Hole Location:Sec:21 Twp: 7N 80WFootage: 87 FSL  382 FWL
Log Types:MWD, Mud, CBL, ( partial Triple Combo in 057-06539)
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 115 ft., Weight: 133 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 115 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2400 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 595, Top: 0 ft., Bottom: 2400 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 17370 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3125, Top: 1920 ft., Bottom: 17370 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
LANCE3244 ft.
FOX HILLS3965 ft.
PIERRE4412 ft.
SUSSEX5397 ft.
SHANNON5910 ft.
MANCOS7112 ft.
NIOBRARA7592 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/1/2024                  Interval Top: 8216 ft.    Interval Bottom: 17194 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/21/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/11/2018Treatment End Date:6/24/2018
Treatment Summary:Plug and perf completion: 1,692 bbls of 15% NEFE HCL Acid, 213,953 bbls of fluid, and 1,230,242 lbs of 40/70 and 8,144,106 lbs of 20/40 proppant.
Total fluid used in treatment (bbls):215645Max pressure during treatment (psi):8201
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:37
Total acid used in treatment (bbls):1692Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):35096
Fresh water used in treatment (bbls):213953Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9374348Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:7521 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/28/2018Test Method:
Hours Tested:24Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 1000
BBLS_OIL 1406
BTU_GAS 1400
CALC_BBLS_H2O 1000
CALC_BBLS_OIL 1406
CALC_GOR 748
CALC_MCF_GAS 1051
CASING_PRESS 862
GRAVITY_OIL 38
MCF_GAS 1051
TUBING_PRESS 134
Perforation Data:
Interval Top:8216 ft.# Of Holes:1110
Interval Bottom:17194 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)3078
Total Gas Produced (MCF)25449
GOR8268
GOR DeterminationBOE
Average BOE per Day20.454
Average MCFE per Day118.623

 Federal Financial Assurance  i 

 Tribal Well  i No