|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/1/2023 Measured TD: 18497 ft. Vertical TD: 7184 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/1/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 10/16/2018 | | Proposed Top PZ Location: | Sec:17 Twp: 7N 80W | Footage: 149 FNL 999 FEL | | Bottom Hole Location: | Sec:20 Twp: 7N 80W | Footage: 70 FSL 1014 FEL | | Proposed Depth/Form: | 18136 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 531-45 , Unit Acreage: 1280, Drill Unit: Sec 17 & 20 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 90 ft., Weight: 94 , Citings Type: PLANNED | | Cement: | Sacks: 40, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2400 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 629, Top: 0 ft., Bottom: 2400 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 18366 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 3137, Top: 0 ft., Bottom: 18366 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/23/2017 | | Spud Date: | 8/11/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 18497 ft. | Measured PB depth: | 18383 ft. | | True Vertical TD: | 7184 ft. | True Vertical PB depth: | 7196 ft. | | Top PZ Location: | Sec:17 Twp: 7N 80W | Footage: 149 FNL 999 FEL | | Bottom Hole Location: | Sec:20 Twp: 7N 80W | Footage: 70 FSL 1014 FEL | | Log Types: | MWD, Mud, CBL (Partial Triple Combo in 05-057-06539) | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 115 ft., Weight: 106 , Citings Type: ACTUAL | | Cement: | Sacks: 40, Top: 0 ft., Bottom: 115 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2400 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 595, Top: 0 ft., Bottom: 2400 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 18480 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 3225, Top: 0 ft., Bottom: 18480 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | LANCE | 3246 ft. | | | | | FOX HILLS | 4150 ft. | | | | | PIERRE | 4374 ft. | | | | | SUSSEX | 5381 ft. | | | | | SHANNON | 5924 ft. | | | | | MANCOS | 7124 ft. | | | | | NIOBRARA | 7385 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 11/1/2023 Interval Top: 8177 ft. Interval Bottom: 18303 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/21/2018 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/21/2018 | Treatment End Date: | 6/8/2018 | | Treatment Summary: | Niobrara plug & perf completed with: 2,157 bbls 15% NEFE HCL Acid, 271,084 bbls of fluid, and 1,349,190 lbs of 40/70 and 8,534,400 20/40 proppant.
| | Total fluid used in treatment (bbls): | 273241 | Max pressure during treatment (psi): | 9425 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 42 | | Total acid used in treatment (bbls): | 2157 | Min frac gradient (psi/ft): | 0.85 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 12477 | | Fresh water used in treatment (bbls): | 271084 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 9883590 | Green completions techniques utilized: | No | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7786 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/31/2018 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | FLARED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1762 | | BBLS_OIL | 800 | | BTU_GAS | 1400 | | CALC_BBLS_H2O | 1762 | | CALC_BBLS_OIL | 800 | | CALC_GOR | 708 | | CALC_MCF_GAS | 566 | | CASING_PRESS | 622 | | GRAVITY_OIL | 34 | | MCF_GAS | 566 | | TUBING_PRESS | 145 |
| | Perforation Data: | | Interval Top: | 8177 ft. | # Of Holes: | 1260 | | Interval Bottom: | 18303 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 3351 |
| Total Gas Produced (MCF) | 9951 |
| GOR | 2969 |
| GOR Determination | BOE |
| Average BOE per Day | 13.921 |
| Average MCFE per Day | 80.749 |
| Federal Financial Assurance | i | |
|
|