Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-057-06523
Well Classification: OW Status: PR - 5/1/2025
Well Name/No:Grizzly #3-32H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:FULCRUM ENERGY OPERATING LLC - 10805
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:436006LocationID:436007
County:JACKSON #057Location:NENW 32 8N80W 6
Field:NORTH PARK HORIZONTAL NIOBRARA - #60120Elevation:8074 ft.
Basin:NORTH PARK BASIN  
Planned Location:674FNL  2386 FWLLat/Long: 40.627795 / -106.397892Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.627795 / -106.397892Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/28/2014
End Date: 8/31/2014
Reported: 10/3/2014
Days to report: 33
Disclosure: Sidetrack #00
Start Date: 6/18/2019
End Date: 6/19/2019
Reported: 7/15/2019
Days to report: 26
Disclosure: Sidetrack #00
Start Date: 8/8/2019
End Date: 8/9/2019
Reported: 9/4/2019
Days to report: 26
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2025             Measured TD: 12496 ft.    Vertical TD: 7971 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/1/2016
Proposed Top PZ Location:Sec:32 Twp: 8N 80W Footage: 615 FNL  2240 FEL
Bottom Hole Location:Sec:32 Twp: 8N 80W Footage: 582 FSL  2157 FWL
Proposed Depth/Form:12202 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 531-17 , Unit Acreage: 640, Drill Unit: Sec. 32: All
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1400 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 900, Top: 0 ft., Bottom: 1400 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12446 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1900, Top: 0 ft., Bottom: 12446 ft.

Wellbore Completed
Completion Date:8/13/2014
Spud Date:7/18/2014Spud Date Is:ACTUAL
Measured TD:12496 ft.Measured PB depth:12468 ft.
True Vertical TD:7971 ft.True Vertical PB depth:7969 ft.
Top PZ Location:Sec:32 Twp: 8N 80WFootage: 615 FNL  2240 FEL
Bottom Hole Location:Sec:32 Twp: 8N 80WFootage: 582 FSL  2157 FWL
Log Types:MWD CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1428 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 975, Top: 0 ft., Bottom: 1428 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12468 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1900, Top: 357 ft., Bottom: 12468 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX5343 ft.
SHANNON5857 ft.
NIOBRARA7820 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/1/2025                  Interval Top: 8352 ft.    Interval Bottom: 9336 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/8/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/8/2019Treatment End Date:8/9/2019
Treatment Summary:SandRidge Energy recompleted a 984’ interval in the subject well. The job consisted of pumping a ten (10) stage continuous recompletion placing 210 bbls of 15% NEFe HCL, 108,730 bbls of 25lb XL gel (w/additives), 1,083,319 lb of 20/40 and 180,020 lb 40/70 proppant.
Total fluid used in treatment (bbls):108940Max pressure during treatment (psi):8295
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):210Min frac gradient (psi/ft):1.10
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):108730Disposition method For flowback:
Total proppant used (lbs):1263339Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/18/2019Treatment End Date:6/19/2019
Treatment Summary:This recompletion was a restimulation of existing perfs. The hydraulic fracturing job was one continuous treatment broken up into 14 intervals by utilizing a diversion technique between each interval, stages were diverted by proppant laden sand treatment. All stages were stimulated with water and proppant. 69,528 bbls of total freshwater and 2,022,949 lbs of 100 mesh proppant.
Total fluid used in treatment (bbls):69528Max pressure during treatment (psi):8520
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:14
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):1.01
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):69528Disposition method For flowback:
Total proppant used (lbs):2022949Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/28/2014Treatment End Date:8/31/2014
Treatment Summary:24 stage fracture treatment with 2,296,922 lbs of Crystalline Silica Quartz; 10420 Bbls 60% HCL; 112653 Bbls Crosslink Gel.
Total fluid used in treatment (bbls):123073Max pressure during treatment (psi):7184
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:24
Total acid used in treatment (bbls):10420Min frac gradient (psi/ft):0.68
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):22671
Fresh water used in treatment (bbls):112653Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2296922Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 650
BBLS_OIL 583
BTU_GAS 1450
CALC_BBLS_H2O 560
CALC_BBLS_OIL 583
CALC_GOR 407
CALC_MCF_GAS 237
CASING_PRESS 1283
GRAVITY_OIL 35
MCF_GAS 237
Perforation Data:
Interval Top:8352 ft.# Of Holes:128
Interval Bottom:9336 ft.Hole Size:0.625 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)5216
Total Gas Produced (MCF)1772
GOR339
GOR DeterminationBOE
Average BOE per Day15.023
Average MCFE per Day87.124

 Federal Financial Assurance  i 

 Tribal Well  i No