Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24561
Well Classification: GW Status: SI - 3/1/2026
Well Name/No:Leverich #SR 423-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date3/1/2026
FacilityID:483803LocationID:335045
County:GARFIELD #045Location:LOT 3 13 7S94W 6
Field:RULISON - #75400Elevation:8007 ft.
Basin:PICEANCE BASIN  
Planned Location:1404FSL  879 FELLat/Long: 39.435589 / -107.829233Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.435589 / -107.829232Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/15/2023
End Date: 9/25/2023
Reported: 11/13/2023
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 3/1/2026             Measured TD: 10577 ft.    Vertical TD: 10079 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 3/1/2026
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/29/2025
Proposed Top PZ Location:Sec:13 Twp: 7S 94W Footage: 1404 FSL  879 FEL
Bottom Hole Location:Sec:13 Twp: 7S 94W Footage: 2030 FSL  1948 FWL
Proposed Depth/Form:10845 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1134 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 279, Top: 0 ft., Bottom: 1134 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10845 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 800, Top: 6021 ft., Bottom: 10845 ft.

Wellbore Completed
Completion Date:7/24/2023
Spud Date:7/18/2023Spud Date Is:ACTUAL
Measured TD:10577 ft.Measured PB depth:10519 ft.
True Vertical TD:10079 ft.True Vertical PB depth:10021 ft.
Top PZ Location:Sec:13 Twp: 7S 94WFootage: 2059 FSL  1971 FWL
Bottom Hole Location:Sec:13 Twp: 7S 94WFootage: 2033 FSL  1905 FWL
Log Types:CBL, (RES in API 045-24555 and 045-24560)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: ACTUAL
Cement:Sacks: 189, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1175 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 345, Top: 0 ft., Bottom: 1175 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10577 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1133, Top: 6600 ft., Bottom: 10577 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH1534 ft.
WASATCH G4384 ft.
OHIO CREEK7210 ft.
WILLIAMS FORK - CAMEO7605 ft.
CAMEO9699 ft.
ROLLINS10476 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 3/1/2026                  Interval Top: 7868 ft.    Interval Bottom: 10445 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/2/2023Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:9/15/2023Treatment End Date:9/25/2023
Treatment Summary:132,975 bbls of Slickwater; 2,573,584 of Proppant; 3238 gals of Biocide
Total fluid used in treatment (bbls):133052Max pressure during treatment (psi):7433
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.68
Recycled water used in treatment (bbls):132975Total flowback volume recovered (bbls):38335
Fresh water used in treatment (bbls):77Disposition method For flowback:RECYCLE
Total proppant used (lbs):2573584Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:10176 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/2/2023Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1078
CALC_MCF_GAS 1632
CASING_PRESS 1472
MCF_GAS 1632
TUBING_PRESS 1166
Perforation Data:
Interval Top:7868 ft.# Of Holes:312
Interval Bottom:10445 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)428
Total Gas Produced (MCF)149568
GOR349457
GOR DeterminationMCFE
Average BOE per Day71.934
Average MCFE per Day417.193

 Federal Financial Assurance  i 

 Tribal Well  i No