Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24560
Well Classification: GW Status: PR - 11/2/2023
Well Name/No:Leverich #SR 523-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/2/2023
FacilityID:483802LocationID:335045
County:GARFIELD #045Location:LOT 3 13 7S94W 6
Field:RULISON - #75400Elevation:8007 ft.
Basin:PICEANCE BASIN  
Planned Location:1402FSL  887 FELLat/Long: 39.435583 / -107.829258Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.435583 / -107.829257Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/15/2023
End Date: 9/25/2023
Reported: 11/13/2023
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/2/2023             Measured TD: 10551 ft.    Vertical TD: 10087 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/2/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/29/2025
Proposed Top PZ Location:Sec:13 Twp: 7S 94W Footage: 1402 FSL  887 FEL
Bottom Hole Location:Sec:13 Twp: 7S 94W Footage: 1680 FSL  1947 FWL
Proposed Depth/Form:10804 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1135 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 279, Top: 0 ft., Bottom: 1135 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10804 ft., Weight: 11.60 , Citings Type: PLANNED
Cement:Sacks: 796, Top: 6000 ft., Bottom: 10804 ft.

Wellbore Completed
Completion Date:7/5/2023
Spud Date:6/24/2023Spud Date Is:ACTUAL
Measured TD:10551 ft.Measured PB depth:10506 ft.
True Vertical TD:10087 ft.True Vertical PB depth:10042 ft.
Top PZ Location:Sec:13 Twp: 7S 94WFootage: 1701 FSL  1972 FWL
Bottom Hole Location:Sec:13 Twp: 7S 94WFootage: 1713 FSL  1966 FWL
Log Types:CBL, RES
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: ACTUAL
Cement:Sacks: 189, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1176 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 345, Top: 0 ft., Bottom: 1176 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10551 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1128, Top: 5940 ft., Bottom: 10551 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH1547 ft.
WASATCH G4358 ft.
OHIO CREEK7189 ft.
WILLIAMS FORK - CAMEO7574 ft.
CAMEO9670 ft.
ROLLINS10434 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/2/2023                 Interval Top: 7836 ft.    Interval Bottom: 10390 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/2/2023Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:9/15/2023Treatment End Date:9/25/2023
Treatment Summary:130,927 bbls of Slickwater; 2,560,459 of Proppant; 3333 gals of Biocide
Total fluid used in treatment (bbls):131006Max pressure during treatment (psi):8215
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.68
Recycled water used in treatment (bbls):130927Total flowback volume recovered (bbls):37679
Fresh water used in treatment (bbls):79Disposition method For flowback:RECYCLE
Total proppant used (lbs):2560459Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:10119 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/2/2023Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1078
CALC_MCF_GAS 1848
CASING_PRESS 1445
MCF_GAS 1848
TUBING_PRESS 1188
Perforation Data:
Interval Top:7836 ft.# Of Holes:312
Interval Bottom:10390 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)463
Total Gas Produced (MCF)162301
GOR350542
GOR DeterminationMCFE
Average BOE per Day78.058
Average MCFE per Day452.733

 Federal Financial Assurance  i 

 Tribal Well  i No