Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24559
Well Classification: GW Status: PR - 1/9/2024
Well Name/No:Leverich #WMC 514-18-793
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/9/2024
FacilityID:483801LocationID:335045
County:GARFIELD #045Location:LOT 3 13 7S94W 6
Field:RULISON - #75400Elevation:8007 ft.
Basin:PICEANCE BASIN  
Planned Location:1407FSL  833 FELLat/Long: 39.435596 / -107.829070Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.435596 / -107.829069Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/29/2023
End Date: 12/10/2023
Reported: 1/18/2024
Days to report: 39
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/9/2024             Measured TD: 10270 ft.    Vertical TD: 10061 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/9/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/29/2025
Proposed Top PZ Location:Sec:13 Twp: 7S 94W Footage: 1407 FSL  833 FEL
Bottom Hole Location:Sec:18 Twp: 7S 93W Footage: 440 FSL  688 FWL
Proposed Depth/Form:10541 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1123 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 276, Top: 0 ft., Bottom: 1123 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10541 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 798, Top: 5728 ft., Bottom: 10541 ft.

Wellbore Completed
Completion Date:9/13/2023
Spud Date:9/8/2023Spud Date Is:ACTUAL
Measured TD:10270 ft.Measured PB depth:10224 ft.
True Vertical TD:10061 ft.True Vertical PB depth:10014 ft.
Top PZ Location:Sec:13 Twp: 7S 94WFootage: 473 FSL  674 FWL
Bottom Hole Location:Sec:13 Twp: 7S 94WFootage: 425 FSL  660 FWL
Log Types:CBL, (RES in API 045-24555 and 045-24560)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: ACTUAL
Cement:Sacks: 189, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1179 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 344, Top: 0 ft., Bottom: 1179 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10270 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1129, Top: 4900 ft., Bottom: 10270 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH1523 ft.
WASATCH G4183 ft.
OHIO CREEK7016 ft.
WILLIAMS FORK7396 ft.
CAMEO9368 ft.
ROLLINS10175 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/9/2024                  Interval Top: 7703 ft.    Interval Bottom: 10114 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/9/2024Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:11/29/2023Treatment End Date:12/10/2023
Treatment Summary:124,925 bbls of Slickwater; 2,407,260 of Proppant; 1,536 gals of Biocide
Total fluid used in treatment (bbls):124962Max pressure during treatment (psi):7414
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.70
Recycled water used in treatment (bbls):124925Total flowback volume recovered (bbls):35007
Fresh water used in treatment (bbls):37Disposition method For flowback:RECYCLE
Total proppant used (lbs):2407260Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9879 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/9/2024Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1078
CALC_MCF_GAS 1276
CASING_PRESS 1585
MCF_GAS 1276
TUBING_PRESS 1198
Perforation Data:
Interval Top:7703 ft.# Of Holes:312
Interval Bottom:10114 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)175
Total Gas Produced (MCF)136542
GOR780240
GOR DeterminationMCFE
Average BOE per Day65.055
Average MCFE per Day377.364

 Federal Financial Assurance  i 

 Tribal Well  i No