Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24557
Well Classification: GW Status: PR - 7/1/2024
Well Name/No:Leverich #WMC 523-18-793
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2024
FacilityID:483799LocationID:335045
County:GARFIELD #045Location:LOT 3 13 7S94W 6
Field:RULISON - #75400Elevation:8007 ft.
Basin:PICEANCE BASIN  
Planned Location:1422FSL  814 FELLat/Long: 39.435639 / -107.829002Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.435638 / -107.829002Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/13/2023
End Date: 11/22/2023
Reported: 12/28/2023
Days to report: 36
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2024             Measured TD: 10600 ft.    Vertical TD: 10086 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/29/2025
Proposed Top PZ Location:Sec:13 Twp: 7S 94W Footage: 1422 FSL  814 FEL
Bottom Hole Location:Sec:18 Twp: 7S 93W Footage: 1474 FSL  1560 FWL
Proposed Depth/Form:10858 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78..67 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1130 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 278, Top: 0 ft., Bottom: 1130 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10858 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 797, Top: 6052 ft., Bottom: 10858 ft.

Wellbore Completed
Completion Date:9/30/2023
Spud Date:9/26/2023Spud Date Is:ACTUAL
Measured TD:10600 ft.Measured PB depth:10555 ft.
True Vertical TD:10086 ft.True Vertical PB depth:10041 ft.
Top PZ Location:Sec:18 Twp: 7S 94WFootage: 1494 FSL  1561 FWL
Bottom Hole Location:Sec:18 Twp: 7S 94WFootage: 1495 FSL  1566 FWL
Log Types:CBL, (RES in API 045-24555 and 045-24560)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: ACTUAL
Cement:Sacks: 189, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1134 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 344, Top: 0 ft., Bottom: 1134 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10600 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1126, Top: 6050 ft., Bottom: 10600 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH1502 ft.
WASATCH G4374 ft.
OHIO CREEK7221 ft.
WILLIAMS FORK7553 ft.
CAMEO9686 ft.
ROLLINS10525 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/18/2023                Interval Top: 7950 ft.    Interval Bottom: 10473 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/18/2023Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:11/13/2023Treatment End Date:11/22/2023
Treatment Summary:130,620 bbls of Slickwater; 2,522,210 of Proppant; 2,261 gals of Biocide
Total fluid used in treatment (bbls):130674Max pressure during treatment (psi):7483
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):130620Total flowback volume recovered (bbls):34009
Fresh water used in treatment (bbls):54Disposition method For flowback:RECYCLE
Total proppant used (lbs):2522210Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:10224 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/18/2023Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1078
CALC_MCF_GAS 929
CASING_PRESS 2025
MCF_GAS 929
TUBING_PRESS 1449
Perforation Data:
Interval Top:7950 ft.# Of Holes:312
Interval Bottom:10473 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)233
Total Gas Produced (MCF)181787
GOR780201
GOR DeterminationMCFE
Average BOE per Day86.653
Average MCFE per Day502.580

 Federal Financial Assurance  i 

 Tribal Well  i No