|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 11/17/2025 Measured TD: 10361 ft. Vertical TD: 9476 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 11/17/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/23/2025 | | Proposed Top PZ Location: | Sec:10 Twp: 6S 97W | Footage: 2464 FSL 653 FEL | | Bottom Hole Location: | Sec:10 Twp: 6S 97W | Footage: 2464 FSL 653 FEL | | Proposed Depth/Form: | 10385 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 1-229 , Unit Acreage: 0, Drill Unit: T6S R97W:ALL | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 90 ft., Weight: 47.44 , Citings Type: PLANNED | | Cement: | Sacks: 150, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2530 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1130, Top: 0 ft., Bottom: 2530 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10385 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1699, Top: 2700 ft., Bottom: 10385 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/1/2023 | | Spud Date: | 1/26/2023 | Spud Date Is: | ACTUAL | | Measured TD: | 10361 ft. | Measured PB depth: | 10291 ft. | | True Vertical TD: | 9476 ft. | True Vertical PB depth: | 9406 ft. | | Top PZ Location: | Sec:10 Twp: 6S 97W | Footage: 2479 FSL 672 FEL | | Bottom Hole Location: | Sec:10 Twp: 6S 97W | Footage: 2374 FSL 792 FEL | | Log Types: | CNL, CBL, Mud log (RES in API 045-24261) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: 47.44 , Citings Type: ACTUAL | | Cement: | Sacks: 110, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2615 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 844, Top: 0 ft., Bottom: 2615 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10341 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1407, Top: 1468 ft., Bottom: 10341 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 3150 ft. | 5496 ft. | N | N | | WASATCH G | 5496 ft. | 5742 ft. | N | N | | FORT UNION | 5742 ft. | 7254 ft. | N | N | | OHIO CREEK | 7254 ft. | 7484 ft. | N | N | | WILLIAMS FORK | 7484 ft. | 9747 ft. | N | N | | CAMEO | 9747 ft. | 10145 ft. | N | N | | CAMEO COAL | 10145 ft. | 10162 ft. | N | N | | ROLLINS | 10162 ft. | 10361 ft. | N | N |
Formation WFCM Formation Classification: OW Status: PR - 11/17/2025 Interval Top: 7860 ft. Interval Bottom: 100098 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 8/30/2023 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 8/1/2023 | Treatment End Date: | 8/6/2023 | | Treatment Summary: | 55000 BBLs Slickwater (No Proppant) | | Total fluid used in treatment (bbls): | 55000 | Max pressure during treatment (psi): | 6633 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.43 | | Recycled water used in treatment (bbls): | 40209 | Total flowback volume recovered (bbls): | 15835 | | Fresh water used in treatment (bbls): | 14791 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9544 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/3/2023 | Test Method: | Flowing | | Hours Tested: | 1 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BTU_GAS | 1071 | | CALC_BBLS_H2O | 77 | | CALC_MCF_GAS | 540 | | CASING_PRESS | 2115 | | MCF_GAS | 22 | | TUBING_PRESS | 289 |
| | Perforation Data: | | Interval Top: | 7860 ft. | # Of Holes: | 234 | | Interval Bottom: | 100098 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 482 |
| Total Gas Produced (MCF) | 169037 |
| GOR | 350699 |
| GOR Determination | MCFE |
| Average BOE per Day | 81.227 |
| Average MCFE per Day | 471.109 |
| Federal Financial Assurance | i | |
|
|