Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24504
Well Classification: GW Status: PR - 11/17/2025
Well Name/No:CC #0697-10-08E
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:LARAMIE ENERGY LLC - 10433
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/17/2025
FacilityID:481965LocationID:383264
County:GARFIELD #045Location:NENW 10 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8592 ft.
Basin:PICEANCE BASIN  
Planned Location:129FNL  2479 FWLLat/Long: 39.544328 / -108.206683Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.544328 / -108.206683Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/1/2023
End Date: 8/6/2023
Reported: 8/23/2023
Days to report: 17
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/17/2025             Measured TD: 10725 ft.    Vertical TD: 9980 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/17/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/23/2025
Proposed Top PZ Location:Sec:10 Twp: T6S R97W Footage: 2432 FNL  663 FEL
Bottom Hole Location:Sec:10 Twp: T6S R97W Footage: 2432 FNL  663 FEL
Proposed Depth/Form:10765 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 1-229 , Unit Acreage: 0, Drill Unit: T6S R97W: ALL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 90 ft., Weight: 47.44 , Citings Type: PLANNED
Cement:Sacks: 150, Top: 0 ft., Bottom: 90 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2530 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1130, Top: 0 ft., Bottom: 2530 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10765 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1783, Top: 2700 ft., Bottom: 10765 ft.

Wellbore Completed
Completion Date:2/11/2023
Spud Date:2/4/2023Spud Date Is:ACTUAL
Measured TD:10725 ft.Measured PB depth:10654 ft.
True Vertical TD:9980 ft.True Vertical PB depth:9909 ft.
Top PZ Location:Sec:10 Twp: 6S 97WFootage: 2385 FNL  653 FEL
Bottom Hole Location:Sec:10 Twp: 6S 97WFootage: 2451 FNL  724 FEL
Log Types:CBL, CNL, Mud log (RES in API 045-24261)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 110, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2626 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 0 ft., Bottom: 2626 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10704 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1423, Top: 2186 ft., Bottom: 10704 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
WASATCH3115 ft.5402 ft.NN
WASATCH G5402 ft.5650 ft.NN
FORT UNION5650 ft.7132 ft.NN
OHIO CREEK7132 ft.7333 ft.NN
WILLIAMS FORK7333 ft.9596 ft.NN
CAMEO9596 ft.9994 ft.NN
CAMEO COAL9994 ft.10009 ft.NN
ROLLINS10009 ft.10259 ft.NN
COZZETTE10259 ft.10479 ft.NN
CORCORAN10479 ft.10725 ft.NN

Formation CRCRN                   Formation Classification:  GW                   Status:  PR - 11/17/2025                Interval Top: 10486 ft.    Interval Bottom: 10650 ft.

 Completed Information for Formation CORCORAN
1st Production Date:8/7/2023Choke Size: 
Formation Name:CORCORANCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:8/1/2023Treatment End Date:8/1/2023
Treatment Summary:10000 BBLs Slickwater (No Proppant)
Total fluid used in treatment (bbls):10000Max pressure during treatment (psi):6340
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):8356Total flowback volume recovered (bbls):1790
Fresh water used in treatment (bbls):1644Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9970 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/29/2023Test Method:Flowing
Hours Tested:1Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BTU_GAS 1023
CALC_BBLS_H2O 29
CALC_MCF_GAS 1891
CASING_PRESS 1946
MCF_GAS 79
TUBING_PRESS 947
Perforation Data:
Interval Top:10486 ft.# Of Holes:24
Interval Bottom:10650 ft.Hole Size:0.375 in.

Formation COZZ                     Formation Classification:  GW                     Status:  PR - 11/17/2025                Interval Top: 10250 ft.    Interval Bottom: 10452 ft.

 Completed Information for Formation COZZETTE
1st Production Date:8/7/2023Choke Size: 
Formation Name:COZZETTECommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:8/2/2023Treatment End Date:8/2/2023
Treatment Summary:10000 BBLs Slickwater (No Proppant)
Total fluid used in treatment (bbls):10000Max pressure during treatment (psi):6378
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.53
Recycled water used in treatment (bbls):8356Total flowback volume recovered (bbls):3095
Fresh water used in treatment (bbls):1644Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9970 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/29/2023Test Method:Flowing
Hours Tested:1Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BTU_GAS 1023
CALC_BBLS_H2O 29
CALC_MCF_GAS 1891
CASING_PRESS 1946
MCF_GAS 79
TUBING_PRESS 947
Perforation Data:
Interval Top:10250 ft.# Of Holes:24
Interval Bottom:10452 ft.Hole Size:0.375 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/17/2025                Interval Top: 7932 ft.    Interval Bottom: 9978 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/7/2023Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:8/3/2023Treatment End Date:8/6/2023
Treatment Summary:53000 BBLs slickwater (No Proppant)
Total fluid used in treatment (bbls):53000Max pressure during treatment (psi):6428
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.46
Recycled water used in treatment (bbls):41497Total flowback volume recovered (bbls):62029
Fresh water used in treatment (bbls):11503Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9970 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/29/2023Test Method:Flowing
Hours Tested:1Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BTU_GAS 1023
CALC_BBLS_H2O 29
CALC_MCF_GAS 1891
CASING_PRESS 1946
MCF_GAS 79
TUBING_PRESS 947
Perforation Data:
Interval Top:7932 ft.# Of Holes:204
Interval Bottom:9978 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)585
Total Gas Produced (MCF)203234
GOR347408
GOR DeterminationMCFE
Average BOE per Day97.647
Average MCFE per Day566.360

 Federal Financial Assurance  i 

 Tribal Well  i No