Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24502
Well Classification: GW Status: PR - 6/27/2025
Well Name/No:CC #0697-10-02E
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:LARAMIE ENERGY LLC - 10433
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/27/2025
FacilityID:481963LocationID:383264
County:GARFIELD #045Location:NENW 10 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8592 ft.
Basin:PICEANCE BASIN  
Planned Location:119FNL  2468 FWLLat/Long: 39.544355 / -108.206719Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.544355 / -108.206719Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/11/2023
End Date: 7/17/2023
Reported: 8/23/2023
Days to report: 37
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/27/2025             Measured TD: 10348 ft.    Vertical TD: 9998 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/27/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/23/2025
Proposed Top PZ Location:Sec:10 Twp: 6S 97W Footage: 477 FNL  644 FEL
Bottom Hole Location:Sec:10 Twp: 6S 97W Footage: 477 FNL  644 FEL
Proposed Depth/Form:10487 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 1-229 , Unit Acreage: 0, Drill Unit: T6S R97W: ALL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 90 ft., Weight: 47.44 , Citings Type: PLANNED
Cement:Sacks: 150, Top: 0 ft., Bottom: 90 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2530 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1130, Top: 0 ft., Bottom: 2530 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10487 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1721, Top: 2700 ft., Bottom: 10487 ft.

Wellbore Completed
Completion Date:9/18/2022
Spud Date:9/9/2022Spud Date Is:ACTUAL
Measured TD:10348 ft.Measured PB depth:10290 ft.
True Vertical TD:9998 ft.True Vertical PB depth:9940 ft.
Top PZ Location:Sec:10 Twp: 6S 97WFootage: 459 FNL  709 FEL
Bottom Hole Location:Sec:10 Twp: 6S 97WFootage: 510 FNL  642 FEL
Log Types:CBL, CNL, Mud Log (RES in API 045-24261)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 110, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2615 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1157, Top: 0 ft., Bottom: 2615 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10348 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1368, Top: 3293 ft., Bottom: 10348 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH3122 ft.5248 ft.NN
WASATCH G5248 ft.5472 ft.NN
FORT UNION5472 ft.6869 ft.NN
OHIO CREEK6869 ft.7079 ft.NN
WILLIAMS FORK7079 ft.9342 ft.NN
CAMEO9342 ft.9740 ft.NN
CAMEO COAL9740 ft.9759 ft.NN
ROLLINS9759 ft.10005 ft.NN
COZZETTE10005 ft.10225 ft.NN
CORCORAN10225 ft.10348 ft.NN

Formation COZZ                     Formation Classification:  GW                     Status:  PR - 7/31/2023                 Interval Top: 9977 ft.    Interval Bottom: 10290 ft.

 Completed Information for Formation COZZETTE
1st Production Date:7/17/2023Choke Size: 
Formation Name:COZZETTECommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:7/11/2023Treatment End Date:7/11/2023
Treatment Summary:10000 BBLs Slickwater (No Proppant)
Total fluid used in treatment (bbls):10000Max pressure during treatment (psi):6409
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.60
Recycled water used in treatment (bbls):9165Total flowback volume recovered (bbls):1287
Fresh water used in treatment (bbls):835Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9570 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2023Test Method:fLOWING
Hours Tested:1Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BTU_GAS 1020
CALC_BBLS_H2O 45
CALC_MCF_GAS 1529
CASING_PRESS 2128
MCF_GAS 64
TUBING_PRESS 1134
Perforation Data:
Interval Top:9977 ft.# Of Holes:24
Interval Bottom:10290 ft.Hole Size:0.375 in.

Formation CRCRN                   Formation Classification:  GW                   Status:  PR - 7/31/2023                 Interval Top: 9977 ft.    Interval Bottom: 10290 ft.

 Completed Information for Formation CORCORAN
1st Production Date:7/17/2023Choke Size: 
Formation Name:CORCORANCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:7/11/2023Treatment End Date:7/11/2023
Treatment Summary:10000 BBLs Slickwater (No proppant)
Total fluid used in treatment (bbls):10000Max pressure during treatment (psi):6409
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.61
Recycled water used in treatment (bbls):9165Total flowback volume recovered (bbls):1287
Fresh water used in treatment (bbls):835Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9570 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2023Test Method:Flowing
Hours Tested:1Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BTU_GAS 1020
CALC_BBLS_H2O 45
CALC_MCF_GAS 1529
CASING_PRESS 2128
MCF_GAS 64
TUBING_PRESS 1134
Perforation Data:
Interval Top:9977 ft.# Of Holes:24
Interval Bottom:10290 ft.Hole Size:0.375 in.

Formation CZ-CR                   Formation Classification:  GW                   Status:  CM - 9/29/2025                 Interval Top: 9977 ft.    Interval Bottom: 10225 ft.

 Completed Information for Formation COZZETTE-CORCORAN
1st Production Date:7/17/2023Choke Size: 
Formation Name:COZZETTE-CORCORANCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:7/11/2023Treatment End Date:7/11/2023
Treatment Summary:10000 BBLs Slickwater (No Proppant)
Total fluid used in treatment (bbls):10000Max pressure during treatment (psi):6409
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.60
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1287
Fresh water used in treatment (bbls):835Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BTU_GAS 1020
CALC_BBLS_H2O 45
CALC_MCF_GAS 1529
CASING_PRESS 2128
MCF_GAS 64
TUBING_PRESS 1134
Perforation Data:
Interval Top:9977 ft.# Of Holes:18
Interval Bottom:10225 ft.Hole Size:0.375 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/27/2025                 Interval Top: 7510 ft.    Interval Bottom: 9675 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/17/2023Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:7/12/2023Treatment End Date:7/17/2023
Treatment Summary:63000 BBLs Slickwater (No Proppant)
Total fluid used in treatment (bbls):63000Max pressure during treatment (psi):6480
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):34927
Fresh water used in treatment (bbls):5010Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:7/11/2023Treatment End Date:7/17/2023
Treatment Summary:63000 BBLs Slickwater (No Proppant)
Total fluid used in treatment (bbls):63000Max pressure during treatment (psi):6480
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):57990Total flowback volume recovered (bbls):34927
Fresh water used in treatment (bbls):5010Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9570 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2023Test Method:fLOWING
Hours Tested:1Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BTU_GAS 1134
CALC_BBLS_H2O 45
CALC_MCF_GAS 1529
CASING_PRESS 2128
MCF_GAS 64
TUBING_PRESS 1134
Perforation Data:
Interval Top:7510 ft.# Of Holes:204
Interval Bottom:9675 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)389
Total Gas Produced (MCF)144989
GOR372722
GOR DeterminationMCFE
Average BOE per Day69.725
Average MCFE per Day404.408

 Federal Financial Assurance  i 

 Tribal Well  i No