Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24499
Well Classification: OW Status: PR - 6/6/2023
Well Name/No:FEDERAL #WMC 431-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC075070
Facility Status:PRStatus Date6/6/2023
FacilityID:480800LocationID:480732
County:GARFIELD #045Location:SESW 17 7S93W 6
Field:RULISON - #75400Elevation:8869 ft.
Planned Location:240FSL  1837 FWLLat/Long: 39.439051 / -107.799425Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/18/2023
End Date: 4/26/2023
Reported: 6/13/2023
Days to report: 48
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/6/2023             Measured TD: 11019 ft.    Vertical TD: 10846 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/6/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/20/2024
Proposed Top PZ Location:Sec:20 Twp: 7S 93W Footage: 724 FNL  1948 FEL
Bottom Hole Location:Sec:20 Twp: 7S 93W Footage: 724 FNL  1948 FEL
Proposed Depth/Form:11257 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 84 ft., Weight: 78.67 , Citings Type: PLANNED
Cement:Sacks: 199, Top: 0 ft., Bottom: 84 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 285, Top: 0 ft., Bottom: 1100 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11257 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1017, Top: 6627 ft., Bottom: 11257 ft.

Wellbore Completed
Completion Date:12/20/2022
Spud Date:12/14/2022Spud Date Is:ACTUAL
Measured TD:11019 ft.Measured PB depth:10968 ft.
True Vertical TD:10846 ft.True Vertical PB depth:10795 ft.
Top PZ Location:Sec:20 Twp: 7S 93WFootage: 702 FNL  1965 FEL
Bottom Hole Location:Sec:20 Twp: 7S 93WFootage: 728 FNL  1939 FEL
Log Types:CBL, (Triple Combo in 045-24489)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 90 ft., Weight: 52.78 , Citings Type: ACTUAL
Cement:Sacks: 213, Top: 0 ft., Bottom: 90 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1132 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 352, Top: 0 ft., Bottom: 1132 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11019 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1337, Top: 6255 ft., Bottom: 11019 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2423 ft.
WASATCH G4954 ft.
OHIO CREEK7518 ft.
WILLIAMS FORK8190 ft.
CAMEO10286 ft.
ROLLINS10997 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 6/6/2023                  Interval Top: 8940 ft.    Interval Bottom: 10891 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/6/2023Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/18/2023Treatment End Date:4/26/2023
Treatment Summary:101,303 bbls of Slickwater; 1,947,960 of Proppant; 1,887 gals of Biocide
Total fluid used in treatment (bbls):101348Max pressure during treatment (psi):7348
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.63
Recycled water used in treatment (bbls):101303Total flowback volume recovered (bbls):27292
Fresh water used in treatment (bbls):45Disposition method For flowback:RECYCLE
Total proppant used (lbs):1947960Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:10684 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/6/2023Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1082
CALC_MCF_GAS 2204
CASING_PRESS 1243
MCF_GAS 2204
TUBING_PRESS 986
Perforation Data:
Interval Top:8940 ft.# Of Holes:264
Interval Bottom:10891 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)956
Total Gas Produced (MCF)186242
GOR194813
GOR DeterminationMCFE
Average BOE per Day90.531
Average MCFE per Day525.109

 Federal Financial Assurance  i Y

 Tribal Well  i No