|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/26/2023 Measured TD: 11357 ft. Vertical TD: 10921 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/26/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 9/20/2024 | Proposed Top PZ Location: | Sec:20 Twp: 7S 93W | Footage: 2130 FNL 609 FWL | Bottom Hole Location: | Sec:20 Twp: 7S 93W | Footage: 2130 FNL 609 FWL | Proposed Depth/Form: | 11401 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | Unit: | | Unit Number: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit: | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 84 ft., Weight: 78.67 , Citings Type: PLANNED | Cement: | Sacks: 199, Top: 0 ft., Bottom: 84 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 285, Top: 0 ft., Bottom: 1100 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11401 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 1030, Top: 6714 ft., Bottom: 11401 ft. |
| | |
Wellbore Completed | Completion Date: | 10/20/2022 | Spud Date: | 10/14/2022 | Spud Date Is: | ACTUAL | Measured TD: | 11357 ft. | Measured PB depth: | 11301 ft. | True Vertical TD: | 10921 ft. | True Vertical PB depth: | 10865 ft. | Top PZ Location: | Sec:20 Twp: 7S 93W | Footage: 2104 FNL 682 FWL | Bottom Hole Location: | Sec:20 Twp: 7S 93W | Footage: 2068 FNL 651 FWL | Log Types: | CBL, (Triple Combo in 045-24489)
| Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 84 ft., Weight: 52.78 , Citings Type: ACTUAL | Cement: | Sacks: 199, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1138 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 354, Top: 0 ft., Bottom: 1138 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11357 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1163, Top: 5551 ft., Bottom: 11357 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | WASATCH | 2473 ft. | | | | WASATCH G | 5145 ft. | | | | OHIO CREEK | 7729 ft. | | | | MESAVERDE | 8360 ft. | | | | CAMEO | 10531 ft. | | | | ROLLINS | 11235 ft. | | | |
Formation WFCM Formation Classification: OW Status: PR - 4/26/2023 Interval Top: 8744 ft. Interval Bottom: 11196 ft. Completed Information for Formation WILLIAMS FORK - CAMEO | 1st Production Date: | 4/25/2023 | Choke Size: | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 3/8/2023 | Treatment End Date: | 3/14/2023 | Treatment Summary: | 121,907 bbls of Slickwater; 1,196,280 of Proppant; 1,710 gals of Biocide | Total fluid used in treatment (bbls): | 121948 | Max pressure during treatment (psi): | 7632 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 13 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.60 | Recycled water used in treatment (bbls): | 121907 | Total flowback volume recovered (bbls): | 41500 | Fresh water used in treatment (bbls): | 41 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 1196280 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 10948 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/26/2023 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1082 | CALC_MCF_GAS | 2185 | CASING_PRESS | 1439 | MCF_GAS | 2185 | TUBING_PRESS | 1100 |
| Perforation Data: | Interval Top: | 8744 ft. | # Of Holes: | 312 | Interval Bottom: | 11196 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1555 |
Total Gas Produced (MCF) | 296958 |
GOR | 190969 |
GOR Determination | MCFE |
Average BOE per Day | 144.260 |
Average MCFE per Day | 836.695 |
Federal Financial Assurance | i | Y |
|
|