Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24494
Well Classification: OW Status: PR - 5/1/2023
Well Name/No:FEDERAL #WMC 12-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC075070
Facility Status:PRStatus Date5/1/2023
FacilityID:480795LocationID:480732
County:GARFIELD #045Location:SESW 17 7S93W 6
Field:RULISON - #75400Elevation:8869 ft.
Planned Location:253FSL  1802 FWLLat/Long: 39.439087 / -107.799549Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/23/2023
End Date: 3/4/2023
Reported: 3/14/2023
Days to report: 10
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2023             Measured TD: 11177 ft.    Vertical TD: 10922 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/20/2024
Proposed Top PZ Location:Sec:20 Twp: 7S 93W Footage: 1470 FNL  606 FWL
Bottom Hole Location:Sec:20 Twp: 7S 93W Footage: 1470 FNL  606 FWL
Proposed Depth/Form:11231 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 84 ft., Weight: 78.67 , Citings Type: PLANNED
Cement:Sacks: 199, Top: 0 ft., Bottom: 84 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 285, Top: 0 ft., Bottom: 1100 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11231 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1025, Top: 6565 ft., Bottom: 11231 ft.

Wellbore Completed
Completion Date:9/30/2022
Spud Date:9/25/2022Spud Date Is:ACTUAL
Measured TD:11177 ft.Measured PB depth:11118 ft.
True Vertical TD:10922 ft.True Vertical PB depth:10863 ft.
Top PZ Location:Sec:20 Twp: 7S 93WFootage: 1389 FNL  702 FWL
Bottom Hole Location:Sec:20 Twp: 7S 93WFootage: 1521 FNL  616 FWL
Log Types:CBL, (Triple Combo in 045-24489)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 81 ft., Weight: 78.67 , Citings Type: ACTUAL
Cement:Sacks: 192, Top: 0 ft., Bottom: 81 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1162 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 353, Top: 0 ft., Bottom: 1162 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11177 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1158, Top: 6450 ft., Bottom: 11177 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2428 ft.
WASATCH G5020 ft.
OHIO CREEK7531 ft.
MESAVERDE8192 ft.
CAMEO10333 ft.
ROLLINS11059 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 5/1/2023                  Interval Top: 8546 ft.    Interval Bottom: 11000 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/12/2023Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:2/23/2023Treatment End Date:3/4/2023
Treatment Summary:122,745 bbls of Slickwater; 2,416,500 of Proppant; 2,352 gals of Biocide
Total fluid used in treatment (bbls):122801Max pressure during treatment (psi):7469
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.60
Recycled water used in treatment (bbls):122745Total flowback volume recovered (bbls):33708
Fresh water used in treatment (bbls):56Disposition method For flowback:RECYCLE
Total proppant used (lbs):2416500Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:10760 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/12/2020Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1082
CALC_MCF_GAS 3778
CASING_PRESS 1700
MCF_GAS 3778
TUBING_PRESS 1598
Perforation Data:
Interval Top:8546 ft.# Of Holes:312
Interval Bottom:11000 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2024 - January 2025i
Total Oil Produced (Barrels)1815
Total Gas Produced (MCF)347188
GOR191288
GOR DeterminationMCFE
Average BOE per Day168.569
Average MCFE per Day977.714

 Federal Financial Assurance  i Y

 Tribal Well  i No