Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24493
Well Classification: GW Status: PR - 4/4/2023
Well Name/No:FEDERAL #WMC 411-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC075070
Facility Status:PRStatus Date4/4/2023
FacilityID:480794LocationID:480732
County:GARFIELD #045Location:SESW 17 7S93W 6
Field:RULISON - #75400Elevation:8869 ft.
Planned Location:255FSL  1796 FWLLat/Long: 39.439094 / -107.799574Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/10/2023
End Date: 2/19/2023
Reported: 3/14/2023
Days to report: 23
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/4/2023             Measured TD: 11057 ft.    Vertical TD: 10908 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/4/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/20/2024
Proposed Top PZ Location:Sec:20 Twp: 7S 93W Footage: 841 FNL  612 FWL
Bottom Hole Location:Sec:20 Twp: 7S 93W Footage: 841 FNL  612 FWL
Proposed Depth/Form:11120 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 84 ft., Weight: 78.67 , Citings Type: PLANNED
Cement:Sacks: 199, Top: 0 ft., Bottom: 84 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 285, Top: 0 ft., Bottom: 1100 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11120 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1022, Top: 6470 ft., Bottom: 11120 ft.

Wellbore Completed
Completion Date:9/24/2022
Spud Date:9/19/2022Spud Date Is:ACTUAL
Measured TD:11057 ft.Measured PB depth:11000 ft.
True Vertical TD:10908 ft.True Vertical PB depth:10851 ft.
Top PZ Location:Sec:20 Twp: 7S 93WFootage: 808 FNL  707 FWL
Bottom Hole Location:Sec:20 Twp: 7S 93WFootage: 805 FNL  676 FWL
Log Types:CBL, (Triple Combo in 045-24489)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 84 ft., Weight: 52.78 , Citings Type: ACTUAL
Cement:Sacks: 286, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1138 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 351, Top: 0 ft., Bottom: 1138 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11057 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1153, Top: 4647 ft., Bottom: 11057 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2395 ft.
WASATCH G4956 ft.
OHIO CREEK7453 ft.
MESAVERDE8075 ft.
CAMEO10206 ft.
ROLLINS10961 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/4/2023                  Interval Top: 8432 ft.    Interval Bottom: 10893 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/4/2023Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:2/10/2023Treatment End Date:2/19/2023
Treatment Summary:123,906 bbls of Slickwater; 2,423,120 of Proppant; 2,289 gals of Biocide
Total fluid used in treatment (bbls):123961Max pressure during treatment (psi):7295
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.59
Recycled water used in treatment (bbls):123906Total flowback volume recovered (bbls):55908
Fresh water used in treatment (bbls):55Disposition method For flowback:RECYCLE
Total proppant used (lbs):2423120Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:10650 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/4/2023Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1082
CALC_MCF_GAS 3234
CASING_PRESS 1604
MCF_GAS 3234
TUBING_PRESS 1604
Perforation Data:
Interval Top:8432 ft.# Of Holes:312
Interval Bottom:10893 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2024 - January 2025i
Total Oil Produced (Barrels)1236
Total Gas Produced (MCF)233996
GOR189317
GOR DeterminationMCFE
Average BOE per Day113.770
Average MCFE per Day659.866

 Federal Financial Assurance  i Y

 Tribal Well  i No