|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/4/2023 Measured TD: 11004 ft. Vertical TD: 10911 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/4/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 9/20/2024 | Proposed Top PZ Location: | Sec:20 Twp: 7S 93W | Footage: 225 FNL 614 FWL | Bottom Hole Location: | Sec:20 Twp: 7S 93W | Footage: 225 FNL 614 FWL | Proposed Depth/Form: | 11058 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | Unit: | | Unit Number: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit: | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 84 ft., Weight: 78.67 , Citings Type: PLANNED | Cement: | Sacks: 199, Top: 0 ft., Bottom: 84 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 285, Top: 0 ft., Bottom: 1100 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11058 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 1019, Top: 6419 ft., Bottom: 11058 ft. |
| | |
Wellbore Completed | Completion Date: | 9/6/2022 | Spud Date: | 8/29/2022 | Spud Date Is: | ACTUAL | Measured TD: | 11004 ft. | Measured PB depth: | 10948 ft. | True Vertical TD: | 10911 ft. | True Vertical PB depth: | 10855 ft. | Top PZ Location: | Sec:20 Twp: 7S 93W | Footage: 189 FNL 707 FWL | Bottom Hole Location: | Sec:20 Twp: 7S 93W | Footage: 229 FNL 642 FWL | Log Types: | CBL, (Triple Combo in API 045-24489) | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 84 ft., Weight: 52.78 , Citings Type: ACTUAL | Cement: | Sacks: 286, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1133 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 350, Top: 0 ft., Bottom: 1133 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11004 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1079, Top: 5941 ft., Bottom: 11004 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | WASATCH | 2097 ft. | | | | WASATCH G | 4915 ft. | | | | OHIO CREEK | 7398 ft. | | | | WILLIAMS FORK | 7998 ft. | | | | CAMEO | 10165 ft. | | | | ROLLINS | 10902 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 4/4/2023 Interval Top: 8373 ft. Interval Bottom: 10786 ft. Completed Information for Formation WILLIAMS FORK - CAMEO | 1st Production Date: | 4/4/2023 | Choke Size: | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 2/9/2023 | Treatment End Date: | 2/19/2023 | Treatment Summary: | 124,732 bbls of Slickwater; 2,380,060 of Proppant; 2,443 gals of Biocide | Total fluid used in treatment (bbls): | 124790 | Max pressure during treatment (psi): | 7533 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 13 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.56 | Recycled water used in treatment (bbls): | 124732 | Total flowback volume recovered (bbls): | 44959 | Fresh water used in treatment (bbls): | 58 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 2380060 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 10542 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/4/2023 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1082 | CALC_MCF_GAS | 2127 | CASING_PRESS | 1329 | MCF_GAS | 2127 | TUBING_PRESS | 1329 |
| Perforation Data: | Interval Top: | 8373 ft. | # Of Holes: | 312 | Interval Bottom: | 10786 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1230 |
Total Gas Produced (MCF) | 234302 |
GOR | 190489 |
GOR Determination | MCFE |
Average BOE per Day | 113.896 |
Average MCFE per Day | 660.609 |
Federal Financial Assurance | i | Y |
|
|