|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/30/2023 Measured TD: 11358 ft. Vertical TD: 10918 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/30/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 9/20/2024 | Proposed Top PZ Location: | Sec:20 Twp: 7S 93W | Footage: 2360 FNL 1921 FEL | Bottom Hole Location: | Sec:20 Twp: 7S 93W | Footage: 2360 FNL 1921 FEL | Proposed Depth/Form: | 11593 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | Unit: | | Unit Number: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit: | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 84 ft., Weight: 78.67 , Citings Type: PLANNED | Cement: | Sacks: 199, Top: 0 ft., Bottom: 84 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 285, Top: 0 ft., Bottom: 1100 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11593 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 1017, Top: 6963 ft., Bottom: 11593 ft. |
| | |
Wellbore Completed | Completion Date: | 12/6/2022 | Spud Date: | 12/1/2022 | Spud Date Is: | ACTUAL | Measured TD: | 11358 ft. | Measured PB depth: | 11311 ft. | True Vertical TD: | 10918 ft. | True Vertical PB depth: | 10872 ft. | Top PZ Location: | Sec:20 Twp: 7S 93W | Footage: 1987 FNL 1911 FEL | Bottom Hole Location: | Sec:20 Twp: 7S 93W | Footage: 2059 FNL 1941 FEL | Log Types: | CBL, (Triple Combo in 045-24489) | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 90 ft., Weight: 52.78 , Citings Type: ACTUAL | Cement: | Sacks: 213, Top: 0 ft., Bottom: 90 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1134 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 357, Top: 0 ft., Bottom: 1134 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11358 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1353, Top: 6678 ft., Bottom: 11358 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | WASATCH | 2462 ft. | | | | WASATCH G | 5125 ft. | | | | OHIO CREEK | 7760 ft. | | | | WILLIAMS FORK | 8475 ft. | | | | CAMEO | 10503 ft. | | | | ROLLINS | 11239 ft. | | | |
Formation WFCM Formation Classification: OW Status: PR - 5/30/2023 Interval Top: 9162 ft. Interval Bottom: 11189 ft. Completed Information for Formation WILLIAMS FORK - CAMEO | 1st Production Date: | 5/30/2023 | Choke Size: | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 4/19/2023 | Treatment End Date: | 4/27/2023 | Treatment Summary: | 103,563 bbls of Slickwater; 2,031,182 lbs of Proppant; 1940 gals of Biocide | Total fluid used in treatment (bbls): | 103609 | Max pressure during treatment (psi): | 7522 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 11 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.61 | Recycled water used in treatment (bbls): | 103563 | Total flowback volume recovered (bbls): | 29907 | Fresh water used in treatment (bbls): | 46 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 2031182 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 10992 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/30/2023 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1082 | CALC_MCF_GAS | 2366 | CASING_PRESS | 1397 | MCF_GAS | 2366 | TUBING_PRESS | 1039 |
| Perforation Data: | Interval Top: | 9162 ft. | # Of Holes: | 264 | Interval Bottom: | 11189 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1200 |
Total Gas Produced (MCF) | 233701 |
GOR | 194750 |
GOR Determination | MCFE |
Average BOE per Day | 113.586 |
Average MCFE per Day | 658.791 |
Federal Financial Assurance | i | Y |
|
|