|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/4/2023 Measured TD: 11018 ft. Vertical TD: 10911 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/4/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 9/20/2024 | Proposed Top PZ Location: | Sec:20 Twp: 7S 93W | Footage: 550 FNL 614 FWL | Bottom Hole Location: | Sec:20 Twp: 7S 93W | Footage: 550 FNL 614 FWL | Proposed Depth/Form: | 11080 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | Unit: | | Unit Number: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit: | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 84 ft., Weight: 78.67 , Citings Type: PLANNED | Cement: | Sacks: 199, Top: 0 ft., Bottom: 84 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 285, Top: 0 ft., Bottom: 1100 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11080 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 1020, Top: 6437 ft., Bottom: 11080 ft. |
| | |
Wellbore Completed | Completion Date: | 9/11/2022 | Spud Date: | 9/6/2022 | Spud Date Is: | ACTUAL | Measured TD: | 11018 ft. | Measured PB depth: | 10961 ft. | True Vertical TD: | 10911 ft. | True Vertical PB depth: | 10855 ft. | Top PZ Location: | Sec:20 Twp: 7S 93W | Footage: 498 FNL 713 FWL | Bottom Hole Location: | Sec:20 Twp: 7S 93W | Footage: 515 FNL 671 FWL | Log Types: | CBL, (Triple Combo in API 045-24489)
| Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 85 ft., Weight: 78.67 , Citings Type: ACTUAL | Cement: | Sacks: 289, Top: 0 ft., Bottom: 85 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1137 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 351, Top: 0 ft., Bottom: 1137 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11018 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1080, Top: 6550 ft., Bottom: 11018 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | WASATCH | 2374 ft. | | | | WASATCH G | 4936 ft. | | | | OHIO CREEK | 7418 ft. | | | | WILLIAMS FORK | 8017 ft. | | | | CAMEO | 10172 ft. | | | | ROLLINS | 10911 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 4/4/2023 Interval Top: 8385 ft. Interval Bottom: 10816 ft. Completed Information for Formation WILLIAMS FORK - CAMEO | 1st Production Date: | 4/4/2023 | Choke Size: | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 2/9/2023 | Treatment End Date: | 2/19/2023 | Treatment Summary: | 122,557 bbls of Slickwater; 2,381,385 of Proppant; 2,391 gals of Biocide | Total fluid used in treatment (bbls): | 122614 | Max pressure during treatment (psi): | 7379 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 13 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.56 | Recycled water used in treatment (bbls): | 122557 | Total flowback volume recovered (bbls): | 53411 | Fresh water used in treatment (bbls): | 57 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 2381385 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 10576 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/4/2023 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1082 | CALC_MCF_GAS | 3393 | CASING_PRESS | 1482 | MCF_GAS | 3393 | TUBING_PRESS | 1701 |
| Perforation Data: | Interval Top: | 8385 ft. | # Of Holes: | 312 | Interval Bottom: | 10816 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1382 |
Total Gas Produced (MCF) | 269309 |
GOR | 194869 |
GOR Determination | MCFE |
Average BOE per Day | 130.887 |
Average MCFE per Day | 759.136 |
Federal Financial Assurance | i | Y |
|
|