|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/1/2025 Measured TD: 12200 ft. Vertical TD: 11859 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/16/2025 | | Proposed Top PZ Location: | Sec:22 Twp: 4S 96W | Footage: 929 FSL 938 FEL | | Bottom Hole Location: | Sec:22 Twp: 4S 96W | Footage: 895 FSL 1032 FEL | | Proposed Depth/Form: | 12600 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | Big Jimmy | Unit Number: | COC074105X | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: 36# , Citings Type: PLANNED | | Cement: | Sacks: 710, Top: 1400 ft., Bottom: 3000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12484 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 1419, Top: 3500 ft., Bottom: 12484 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: 9.625 in., Top: 0 ft., Depth: 1400 ft., Weight: StageTool, Citings Type: PLANNED | | Cement: | Sacks: 312, Top: 0 ft., Bottom: 1400 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/8/2024 | | Spud Date: | 2/2/2024 | Spud Date Is: | ACTUAL | | Measured TD: | 12200 ft. | Measured PB depth: | 12103 ft. | | True Vertical TD: | 11859 ft. | True Vertical PB depth: | 11763 ft. | | Top PZ Location: | Sec:22 Twp: 4S 96W | Footage: 934 FSL 953 FEL | | Bottom Hole Location: | Sec:22 Twp: 4S 96W | Footage: 909 FSL 1064 FEL | | Log Types: | CBL, PNL (DIL in API 045-24389) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 125 ft., Weight: 94# , Citings Type: ACTUAL | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 125 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3023 ft., Weight: 36# , Citings Type: ACTUAL | | Cement: | Sacks: 720, Top: 906 ft., Bottom: 3023 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12182 ft., Weight: 13.5# , Citings Type: ACTUAL | | Cement: | Sacks: 1811, Top: 4142 ft., Bottom: 12182 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 906 ft., Bottom: 906 ft., Sacks: 352, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | 3448 ft. | N | N | | WASATCH | 3448 ft. | 5870 ft. | N | N | | WASATCH G | 5870 ft. | 6213 ft. | N | N | | FORT UNION | 6213 ft. | 8330 ft. | N | N | | OHIO CREEK | 8330 ft. | 8813 ft. | N | N | | WILLIAMS FORK | 8813 ft. | 11508 ft. | N | N | | CAMEO | 11508 ft. | 12055 ft. | N | N | | ROLLINS | 12055 ft. | 12200 ft. | N | N |
Formation WFOCCM Formation Classification: OW Status: PR - 1/19/2025 Interval Top: 8333 ft. Interval Bottom: 11943 ft.| Completed Information for Formation WILLIAMS FORK-OHIO CREEK-CAMEO | | 1st Production Date: | 1/19/2025 | Choke Size: | | | Formation Name: | WILLIAMS FORK-OHIO CREEK-CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 1/2/2025 | Treatment End Date: | 1/18/2025 | | Treatment Summary: | 14 Stages Plug Perf, 269,333 bbls recycled water, 0 bbls freshwater, 167 bbls 7.5% HCI acid
| | Total fluid used in treatment (bbls): | 269500 | Max pressure during treatment (psi): | 8048 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.41 | | Type Of gas: | | Number Of staged intervals: | 14 | | Total acid used in treatment (bbls): | 167 | Min frac gradient (psi/ft): | 0.62 | | Recycled water used in treatment (bbls): | 269333 | Total flowback volume recovered (bbls): | 27230 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/19/2025 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 888 | | BTU_GAS | 998 | | CALC_BBLS_H2O | 888 | | CALC_MCF_GAS | 952 | | CASING_PRESS | 2300 | | MCF_GAS | 952 |
| | Perforation Data: | | Interval Top: | 8333 ft. | # Of Holes: | 396 | | Interval Bottom: | 11943 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 482 |
| Total Gas Produced (MCF) | 681115 |
| GOR | 1413101 |
| GOR Determination | MCFE |
| Average BOE per Day | 327.629 |
| Average MCFE per Day | 1900.272 |
| Federal Financial Assurance | i | Y |
|
|