|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 11/1/2024 Measured TD: 12005 ft. Vertical TD: 11985 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 11/1/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/16/2025 | | Proposed Top PZ Location: | Sec:23 Twp: 4S 96W | Footage: 1012 FSL 1045 FWL | | Bottom Hole Location: | Sec:23 Twp: 4S 96W | Footage: 977 FSL 951 FWL | | Proposed Depth/Form: | 12314 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | Big Jimmy | Unit Number: | COC074105X | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: 36# , Citings Type: PLANNED | | Cement: | Sacks: 710, Top: 1400 ft., Bottom: 3000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12302 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 1389, Top: 3500 ft., Bottom: 12302 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: 9.625 in., Top: , Depth: 1400 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 312, Top: 0 ft., Bottom: 1400 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/10/2024 | | Spud Date: | 1/2/2024 | Spud Date Is: | ACTUAL | | Measured TD: | 12005 ft. | Measured PB depth: | 11909 ft. | | True Vertical TD: | 11985 ft. | True Vertical PB depth: | 11889 ft. | | Top PZ Location: | Sec:23 Twp: 4S 96W | Footage: 1011 FSL 1034 FWL | | Bottom Hole Location: | Sec:23 Twp: 4S 96W | Footage: 951 FSL 992 FWL | | Log Types: | CBL, PNL (DIL in 045-24389) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 125 ft., Weight: 94# , Citings Type: ACTUAL | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 125 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3025 ft., Weight: 36# , Citings Type: ACTUAL | | Cement: | Sacks: 720, Top: 923 ft., Bottom: 3025 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11986 ft., Weight: 13.5# , Citings Type: ACTUAL | | Cement: | Sacks: 1554, Top: 4186 ft., Bottom: 11986 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 923 ft., Bottom: 923 ft., Sacks: 352, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | 3349 ft. | N | N | | WASATCH | 3349 ft. | 5671 ft. | N | N | | WASATCH G | 5671 ft. | 6012 ft. | N | N | | FORT UNION | 6012 ft. | 8076 ft. | N | N | | OHIO CREEK | 8076 ft. | 8574 ft. | N | N | | WILLIAMS FORK | 8574 ft. | 11249 ft. | N | N | | CAMEO | 11249 ft. | 11814 ft. | N | N | | ROLLINS | 11814 ft. | 12005 ft. | N | N |
Formation WFOCCM Formation Classification: OW Status: PR - 11/26/2024 Interval Top: 8082 ft. Interval Bottom: 11801 ft.| Completed Information for Formation WILLIAMS FORK-OHIO CREEK-CAMEO | | 1st Production Date: | 11/26/2024 | Choke Size: | | | Formation Name: | WILLIAMS FORK-OHIO CREEK-CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 11/15/2024 | Treatment End Date: | 11/23/2024 | | Treatment Summary: | 14 Stages Plug Perf, 269,500 bbls recycled water, 0 bbls freshwater, 167 bbls 7.5% HCI acid | | Total fluid used in treatment (bbls): | 269500 | Max pressure during treatment (psi): | 8012 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.41 | | Type Of gas: | | Number Of staged intervals: | 14 | | Total acid used in treatment (bbls): | 167 | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 269333 | Total flowback volume recovered (bbls): | 35693 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/26/2024 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 360 | | BTU_GAS | 994 | | CALC_BBLS_H2O | 360 | | CALC_MCF_GAS | 1021 | | CASING_PRESS | 3797 | | MCF_GAS | 1021 |
| | Perforation Data: | | Interval Top: | 8082 ft. | # Of Holes: | 396 | | Interval Bottom: | 11801 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 699 |
| Total Gas Produced (MCF) | 1013259 |
| GOR | 1449583 |
| GOR Determination | MCFE |
| Average BOE per Day | 481.353 |
| Average MCFE per Day | 2791.844 |
| Federal Financial Assurance | i | Y |
|
|