Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24363
Well Classification: GW Status: PR - 1/20/2022
Well Name/No:CHEVRON #GM 541-30
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC036219
Facility Status:PRStatus Date1/20/2022
FacilityID:477213LocationID:335260
County:GARFIELD #045Location:LOT 3 29 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5849 ft.
Basin:PICEANCE BASIN  
Planned Location:1538FNL  809 FWLLat/Long: 39.498169 / -108.138960Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.498169 / -108.138960Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/13/2021
End Date: 12/22/2021
Reported: 1/31/2022
Days to report: 40
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/20/2022             Measured TD: 7548 ft.    Vertical TD: 6848 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/20/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/12/2022
Proposed Top PZ Location:Sec:30 Twp: 6S 96W Footage: 1101 FNL  1636 FEL
Bottom Hole Location:Sec:30 Twp: 6S 96W Footage: 1101 FNL  1636 FEL
Proposed Depth/Form:7547 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.4 , Citings Type: PLANNED
Cement:Sacks: 134, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 240, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7547 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 581, Top: 4123 ft., Bottom: 7547 ft.

Wellbore Completed
Completion Date:10/14/2021
Spud Date:10/10/2021Spud Date Is:ACTUAL
Measured TD:7548 ft.Measured PB depth:7501 ft.
True Vertical TD:6848 ft.True Vertical PB depth:6801 ft.
Top PZ Location:Sec:30 Twp: 6S 96WFootage: 1087 FNL  1608 FEL
Bottom Hole Location:Sec:30 Twp: 6S 96WFootage: 1094 FNL  1638 FEL
Log Types:CBL, NEU, RES
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: ACTUAL
Cement:Sacks: 189, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1031 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 268, Top: 0 ft., Bottom: 1031 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7538 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 749, Top: 3989 ft., Bottom: 7548 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.NN
WASATCH G2600 ft.NN
OHIO CREEK4480 ft.NN
WILLIAMS FORK5013 ft.NN
CAMEO6948 ft.NN
ROLLINS7467 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 1/20/2022                 Interval Top: 5552 ft.    Interval Bottom: 7405 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:1/20/2022Choke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/13/2021Treatment End Date:12/22/2021
Treatment Summary:132,293 BBLs of Slickwater; 4,252 gals of Biocide
Total fluid used in treatment (bbls):132394Max pressure during treatment (psi):7457
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.70
Recycled water used in treatment (bbls):132293Total flowback volume recovered (bbls):29988
Fresh water used in treatment (bbls):101Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7260 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/20/2022Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1063
CALC_MCF_GAS 1717
CASING_PRESS 1740
MCF_GAS 1717
TUBING_PRESS 1659
Perforation Data:
Interval Top:5552 ft.# Of Holes:264
Interval Bottom:7405 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)333
Total Gas Produced (MCF)191051
GOR573726
GOR DeterminationMCFE
Average BOE per Day91.238
Average MCFE per Day529.176

 Federal Financial Assurance  i Y

 Tribal Well  i No