Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24361
Well Classification: GW Status: PR - 5/6/2021
Well Name/No:CHEVRON #GM 632-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC023794
Facility Status:PRStatus Date5/6/2021
FacilityID:476787LocationID:335426
County:GARFIELD #045Location:SWNW 20 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5748 ft.
Basin:PICEANCE BASIN  
Planned Location:1918FNL  645 FWLLat/Long: 39.511792 / -108.139582Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.511793 / -108.139582Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/29/2021
End Date: 4/7/2021
Reported: 5/12/2021
Days to report: 35
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/6/2021             Measured TD: 7786 ft.    Vertical TD: 6829 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/6/2021
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/4/2022
Proposed Top PZ Location:Sec:19 Twp: 6S 96W Footage: 1881 FNL  2051 FEL
Bottom Hole Location:Sec:19 Twp: 6S 96W Footage: 1881 FNL  2051 FEL
Proposed Depth/Form:7791 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.4 , Citings Type: PLANNED
Cement:Sacks: 134, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 240, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7791 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 533, Top: 4414 ft., Bottom: 7791 ft.

Wellbore Completed
Completion Date:1/6/2021
Spud Date:12/16/2020Spud Date Is:ACTUAL
Measured TD:7786 ft.Measured PB depth:7745 ft.
True Vertical TD:6829 ft.True Vertical PB depth:6787 ft.
Top PZ Location:Sec:19 Twp: 6S 96WFootage: 1897 FNL  2019 FEL
Bottom Hole Location:Sec:19 Twp: 6S 96WFootage: 1929 FNL  2079 FEL
Log Types:CBL, (DEN/NEU IN API 045-24351)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 84 ft., Weight: 78.67 , Citings Type: ACTUAL
Cement:Sacks: 199, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1028 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 268, Top: 0 ft., Bottom: 1028 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7776 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 713, Top: 3326 ft., Bottom: 7786 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2676 ft.
WASATCH3559 ft.
OHIO CREEK4707 ft.
WILLIAMS FORK4977 ft.
CAMEO7000 ft.
ROLLINS7727 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/6/2021                  Interval Top: 5817 ft.    Interval Bottom: 7616 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/6/2021Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/29/2021Treatment End Date:4/7/2021
Treatment Summary:85619 bbls of Slickwater; 2855 gals Biocide
Total fluid used in treatment (bbls):85687Max pressure during treatment (psi):7076
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.73
Recycled water used in treatment (bbls):85619Total flowback volume recovered (bbls):39596
Fresh water used in treatment (bbls):68Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7448 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/6/2021Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1172
CALC_MCF_GAS 1680
CASING_PRESS 1440
MCF_GAS 1680
TUBING_PRESS 1352
Perforation Data:
Interval Top:5817 ft.# Of Holes:264
Interval Bottom:7616 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)83
Total Gas Produced (MCF)79990
GOR963734
GOR DeterminationMCFE
Average BOE per Day38.038
Average MCFE per Day220.626

 Federal Financial Assurance  i Y

 Tribal Well  i No