Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24351
Well Classification: GW Status: PR - 5/6/2021
Well Name/No:CHEVRON #GM 31-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC023794
Facility Status:PRStatus Date5/6/2021
FacilityID:476777LocationID:335426
County:GARFIELD #045Location:SWNW 20 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5748 ft.
Basin:PICEANCE BASIN  
Planned Location:1904FNL  633 FWLLat/Long: 39.511830 / -108.139623Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.511829 / -108.139623Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/29/2021
End Date: 4/6/2021
Reported: 5/12/2021
Days to report: 36
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/6/2021             Measured TD: 7873 ft.    Vertical TD: 6879 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/6/2021
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/4/2022
Proposed Top PZ Location:Sec:19 Twp: 6S 96W Footage: 110 FNL  1857 FEL
Bottom Hole Location:Sec:19 Twp: 6S 96W Footage: 110 FNL  1857 FEL
Proposed Depth/Form:7873 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.4 , Citings Type: PLANNED
Cement:Sacks: 134, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 240, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7873 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 531, Top: 4506 ft., Bottom: 7873 ft.

Wellbore Completed
Completion Date:12/22/2020
Spud Date:12/19/2020Spud Date Is:ACTUAL
Measured TD:7873 ft.Measured PB depth:7833 ft.
True Vertical TD:6879 ft.True Vertical PB depth:6839 ft.
Top PZ Location:Sec:19 Twp: 6S 96WFootage: 99 FNL  1836 FEL
Bottom Hole Location:Sec:19 Twp: 6S 96WFootage: 89 FNL  1901 FEL
Log Types:CBL, NEU, (DEN/NEU IN API 045-24351)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 84 ft., Weight: 78.67 , Citings Type: ACTUAL
Cement:Sacks: 199, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1029 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 268, Top: 0 ft., Bottom: 1029 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7866 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 734, Top: 3250 ft., Bottom: 7873 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2686 ft.
WASATCH3572 ft.
OHIO CREEK4749 ft.
WILLIAMS FORK5036 ft.
CAMEO7067 ft.
ROLLINS7802 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/6/2021                  Interval Top: 5871 ft.    Interval Bottom: 7693 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/6/2021Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/29/2021Treatment End Date:4/6/2021
Treatment Summary:130071 bbls of Slickwater; 4270 gals of Biocide
Total fluid used in treatment (bbls):130173Max pressure during treatment (psi):6922
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.71
Recycled water used in treatment (bbls):130071Total flowback volume recovered (bbls):28865
Fresh water used in treatment (bbls):102Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7517 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/6/2021Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1172
CALC_MCF_GAS 989
CASING_PRESS 1738
MCF_GAS 989
TUBING_PRESS 1612
Perforation Data:
Interval Top:5871 ft.# Of Holes:264
Interval Bottom:7693 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)157
Total Gas Produced (MCF)139821
GOR890579
GOR DeterminationMCFE
Average BOE per Day66.488
Average MCFE per Day385.666

 Federal Financial Assurance  i Y

 Tribal Well  i No