Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24339
Well Classification: OW Status: PR - 8/8/2022
Well Name/No:BJU G35 FED #23B-35-496
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC069557
Facility Status:PRStatus Date8/8/2022
FacilityID:476657LocationID:335904
County:GARFIELD #045Location:SWNE 35 4S96W 6
Field:GRAND VALLEY - #31290Elevation:8166 ft.
Basin:PICEANCE BASIN  
Planned Location:1989FNL  2348 FELLat/Long: 39.660611 / -108.134902Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.660611 / -108.134902Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/8/2022             Measured TD: 11678 ft.    Vertical TD: 11623 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/8/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/28/2022
Proposed Top PZ Location:Sec:35 Twp: 4S 96W Footage: 2491 FSL  2138 FEL
Bottom Hole Location:Sec:35 Twp: 4S 96W Footage: 2458 FSL  2231 FEL
Proposed Depth/Form:11712 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit:Big Jimmy Unit Unit Number:COC074105X
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 3000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11725 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 1466, Top: 3000 ft., Bottom: 11725 ft.

Wellbore Completed
Completion Date:2/8/2022
Spud Date:1/30/2022Spud Date Is:ACTUAL
Measured TD:11678 ft.Measured PB depth:11571 ft.
True Vertical TD:11623 ft.True Vertical PB depth:11516 ft.
Top PZ Location:Sec:35 Twp: 4S 96WFootage: 2520 FSL  2171 FEL
Bottom Hole Location:Sec:35 Twp: 4S 96WFootage: 2460 FSL  2248 FEL
Log Types:CBL, PNL, TRIPLE COMBO
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2980 ft., Weight: 36# , Citings Type: ACTUAL
Cement:Sacks: 1055, Top: 0 ft., Bottom: 2980 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11712 ft., Weight: 11.6# , Citings Type: ACTUAL
Cement:Sacks: 1711, Top: 3166 ft., Bottom: 11712 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.3220 ft.NN
WASATCH3220 ft.5581 ft.NN
WASATCH G5581 ft.5957 ft.NN
FORT UNION5957 ft.7851 ft.NN
OHIO CREEK7851 ft.8177 ft.NN
WILLIAMS FORK7851 ft.10880 ft.NN
CAMEO10880 ft.11528 ft.NN
ROLLINS11528 ft.11678 ft.NN

Formation WMFK                     Formation Classification:  OW                     Status:  PR - 8/8/2022                  Interval Top: 7874 ft.    Interval Bottom: 11478 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:8/8/2022Choke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:7/22/2022Treatment End Date:8/6/2022
Treatment Summary:Frac'd with 269333 bbls. slickwater and 167 bbls. of 7.5% HCL.
Total fluid used in treatment (bbls):269333Max pressure during treatment (psi):8476
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.41
Type Of gas:Number Of staged intervals:14
Total acid used in treatment (bbls):167Min frac gradient (psi/ft):0.62
Recycled water used in treatment (bbls):188533Total flowback volume recovered (bbls):44542
Fresh water used in treatment (bbls):80800Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/8/2022Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 648
BTU_GAS 1002
CALC_BBLS_H2O 648
CALC_MCF_GAS 117
CASING_PRESS 881
MCF_GAS 117
Perforation Data:
Interval Top:7874 ft.# Of Holes:396
Interval Bottom:11478 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)113
Total Gas Produced (MCF)153114
GOR1354991
GOR DeterminationMCFE
Average BOE per Day72.686
Average MCFE per Day421.580

 Federal Financial Assurance  i Y

 Tribal Well  i No