|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/6/2026 Measured TD: 9437 ft. Vertical TD: 9377 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/6/2026 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/23/2025 | | Proposed Top PZ Location: | Sec:10 Twp: 6S 97W | Footage: 797 FNL 1964 FWL | | Bottom Hole Location: | Sec:10 Twp: 6S 97W | Footage: 797 FNL 1964 FWL | | Proposed Depth/Form: | 9460 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 1-229 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 1-229 , Unit Acreage: 0, Drill Unit: T6S R97W: ALL | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 90 ft., Weight: 47.44 , Citings Type: PLANNED | | Cement: | Sacks: 150, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2530 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1130, Top: 0 ft., Bottom: 2530 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9460 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1492, Top: 2700 ft., Bottom: 9460 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/4/2022 | | Spud Date: | 10/27/2022 | Spud Date Is: | ACTUAL | | Measured TD: | 9437 ft. | Measured PB depth: | 9379 ft. | | True Vertical TD: | 9377 ft. | True Vertical PB depth: | 9319 ft. | | Top PZ Location: | Sec:10 Twp: 6S 97W | Footage: 765 FNL 1968 FWL | | Bottom Hole Location: | Sec:10 Twp: 6S 97W | Footage: 797 FNL 1964 FWL | | Log Types: | CNL, CBL, Mud Log (RES in API 045-24261) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 84 ft., Weight: 47.44 , Citings Type: ACTUAL | | Cement: | Sacks: 110, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2581 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1058, Top: 0 ft., Bottom: 2581 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9427 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1208, Top: 2773 ft., Bottom: 9427 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 2868 ft. | 4888 ft. | N | N | | WASATCH G | 4888 ft. | 5100 ft. | N | N | | FORT UNION | 5100 ft. | 6412 ft. | N | N | | OHIO CREEK | 6412 ft. | 6622 ft. | N | N | | WILLIAMS FORK | 6622 ft. | 8872 ft. | N | N | | CAMEO | 8872 ft. | 9270 ft. | N | N | | CAMEO COAL | 9270 ft. | 9289 ft. | N | N | | ROLLINS | 9289 ft. | 9437 ft. | N | N |
Formation WFCM Formation Classification: GW Status: PR - 1/6/2026 Interval Top: 7017 ft. Interval Bottom: 9232 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 7/8/2023 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 6/4/2023 | Treatment End Date: | 6/10/2023 | | Treatment Summary: | 63027 BBLs Slickwater (No Proppant) | | Total fluid used in treatment (bbls): | 63027 | Max pressure during treatment (psi): | 6620 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.43 | | Recycled water used in treatment (bbls): | 41479 | Total flowback volume recovered (bbls): | 25275 | | Fresh water used in treatment (bbls): | 21548 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8661 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/8/2023 | Test Method: | Flowing | | Hours Tested: | 1 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BTU_GAS | 1080 | | CALC_BBLS_H2O | 20 | | CALC_MCF_GAS | 1017 | | CASING_PRESS | 1741 | | MCF_GAS | 42 | | TUBING_PRESS | 932 |
| | Perforation Data: | | Interval Top: | 7017 ft. | # Of Holes: | 234 | | Interval Bottom: | 9232 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 417 |
| Total Gas Produced (MCF) | 148609 |
| GOR | 356376 |
| GOR Determination | MCFE |
| Average BOE per Day | 71.417 |
| Average MCFE per Day | 414.255 |
| Federal Financial Assurance | i | |
|
|