Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24104
Well Classification: GW Status: PR - 1/7/2020
Well Name/No:PUCKETT #GM 414-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/7/2020
FacilityID:457405LocationID:323823
County:GARFIELD #045Location:NESW 8 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6281 ft.
Basin:PICEANCE BASIN  
Planned Location:2246FSL  2226 FWLLat/Long: 39.450732 / -108.132710Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.450731 / -108.132710Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/2/2019
End Date: 12/5/2019
Reported: 1/21/2020
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/7/2020             Measured TD: 6765 ft.    Vertical TD: 6535 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/7/2020
Wellbore PermitDIRECTIONAL
Permit #:Expiration Date:9/17/2020
Proposed Top PZ Location:Sec:8 Twp: 7S 96W Footage: 1057 FSL  1504 FWL
Bottom Hole Location:Sec:8 Twp: 7S 96W Footage: 1057 FSL  1504 FWL
Proposed Depth/Form:6810 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-20 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 47.4 , Citings Type: PLANNED
Cement:Sacks: 105, Top: 0 ft., Bottom: 63 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 240, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6810 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 527, Top: 3749 ft., Bottom: 6810 ft.

Wellbore Completed
Completion Date:10/17/2019
Spud Date:10/15/2019Spud Date Is:ACTUAL
Measured TD:6765 ft.Measured PB depth:6724 ft.
True Vertical TD:6535 ft.True Vertical PB depth:6495 ft.
Top PZ Location:Sec:8 Twp: 7S 96WFootage: 1079 FSL  1516 FWL
Bottom Hole Location:Sec:8 Twp: 7S 96WFootage: 1048 FSL  1503 FWL
Log Types:CBL, NEU, (RES in API 045-24094)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 87 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 105, Top: 0 ft., Bottom: 87 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1018 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 1118 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6755 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 3598 ft., Bottom: 6765 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2240 ft.
MESAVERDE3809 ft.
OHIO CREEK3809 ft.
WILLIAMS FORK3921 ft.
CAMEO6198 ft.
ROLLINS6667 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/7/2020                  Interval Top: 5090 ft.    Interval Bottom: 6598 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/7/2020Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/2/2019Treatment End Date:12/5/2019
Treatment Summary:53311 bbls of Slickwater; 783 gals of biocide
Total fluid used in treatment (bbls):53330Max pressure during treatment (psi):6698
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.60
Recycled water used in treatment (bbls):53311Total flowback volume recovered (bbls):19722
Fresh water used in treatment (bbls):19Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6448 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/7/2020Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1086
CALC_MCF_GAS 1299
CASING_PRESS 1030
MCF_GAS 1299
TUBING_PRESS 975
Perforation Data:
Interval Top:5090 ft.# Of Holes:150
Interval Bottom:6598 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)61
Total Gas Produced (MCF)47530
GOR779180
GOR DeterminationMCFE
Average BOE per Day22.640
Average MCFE per Day131.294

 Federal Financial Assurance  i 

 Tribal Well  i No