Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24101
Well Classification: GW Status: PR - 12/31/2019
Well Name/No:PUCKETT #GM 443-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date12/31/2019
FacilityID:457402LocationID:323823
County:GARFIELD #045Location:NESW 8 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6281 ft.
Basin:PICEANCE BASIN  
Planned Location:2275FSL  2252 FWLLat/Long: 39.450810 / -108.132618Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.450810 / -108.132619Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/5/2019
End Date: 12/11/2019
Reported: 1/21/2020
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/31/2019             Measured TD: 7258 ft.    Vertical TD: 6642 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/31/2019
Wellbore PermitDIRECTIONAL
Permit #:Expiration Date:9/17/2020
Proposed Top PZ Location:Sec:8 Twp: 7S 96W Footage: 1823 FSL  653 FEL
Bottom Hole Location:Sec:8 Twp: 7S 96W Footage: 1823 FSL  653 FEL
Proposed Depth/Form:7292 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: Sec 8 E2
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 47.4 , Citings Type: PLANNED
Cement:Sacks: 105, Top: 0 ft., Bottom: 63 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 240, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7292 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 579, Top: 3932 ft., Bottom: 7292 ft.

Wellbore Completed
Completion Date:11/11/2019
Spud Date:11/8/2019Spud Date Is:ACTUAL
Measured TD:7258 ft.Measured PB depth:7217 ft.
True Vertical TD:6642 ft.True Vertical PB depth:6601 ft.
Top PZ Location:Sec:8 Twp: 7S 96WFootage: 1843 FSL  671 FEL
Bottom Hole Location:Sec:8 Twp: 7S 96WFootage: 1808 FSL  688 FEL
Log Types:CBL, NEU, (RES in API 045-24094)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 87 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 105, Top: 0 ft., Bottom: 87 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1033 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 1043 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7248 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 880, Top: 2250 ft., Bottom: 7258 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2407 ft.
MESAVERDE4175 ft.
OHIO CREEK4175 ft.
WILLIAMS FORK4321 ft.
CAMEO6728 ft.
ROLLINS7136 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/31/2019                Interval Top: 5466 ft.    Interval Bottom: 7081 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/31/2019Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/5/2019Treatment End Date:12/11/2019
Treatment Summary:68100 bbls of Slickwater; 707 gals of biocide
Total fluid used in treatment (bbls):68117Max pressure during treatment (psi):5910
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.62
Recycled water used in treatment (bbls):68100Total flowback volume recovered (bbls):25853
Fresh water used in treatment (bbls):17Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6909 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/31/2019Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1086
CALC_MCF_GAS 537
CASING_PRESS 1520
MCF_GAS 537
TUBING_PRESS 1460
Perforation Data:
Interval Top:5466 ft.# Of Holes:165
Interval Bottom:7081 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)112
Total Gas Produced (MCF)88937
GOR794080
GOR DeterminationMCFE
Average BOE per Day42.343
Average MCFE per Day245.603

 Federal Financial Assurance  i Y

 Tribal Well  i No