Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24090
Well Classification: GW Status: PR - 1/7/2019
Well Name/No:PUCKETT #GM 313-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/7/2019
FacilityID:457391LocationID:323823
County:GARFIELD #045Location:NESW 8 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6281 ft.
Basin:PICEANCE BASIN  
Planned Location:2286FSL  2247 FWLLat/Long: 39.450841 / -108.132637Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.450841 / -108.132637Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/2/2019
End Date: 12/5/2019
Reported: 1/21/2020
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/7/2019             Measured TD: 6735 ft.    Vertical TD: 6594 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/7/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/17/2020
Proposed Top PZ Location:Sec:8 Twp: 7S 96W Footage: 2232 FSL  1189 FWL
Bottom Hole Location:Sec:8 Twp: 7S 96W Footage: 2232 FSL  1189 FWL
Proposed Depth/Form:6773 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-20 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.4 , Citings Type: PLANNED
Cement:Sacks: 134, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 240, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6773 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 545, Top: 3608 ft., Bottom: 6773 ft.

Wellbore Completed
Completion Date:11/14/2019
Spud Date:11/11/2019Spud Date Is:ACTUAL
Measured TD:6735 ft.Measured PB depth:6695 ft.
True Vertical TD:6594 ft.True Vertical PB depth:6553 ft.
Top PZ Location:Sec:8 Twp: 7S 96WFootage: 2250 FSL  1199 FWL
Bottom Hole Location:Sec:8 Twp: 7S 96WFootage: 2191 FSL  1172 FWL
Log Types:CBL, NEU, (RES in API 045-24094)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 87 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 105, Top: 0 ft., Bottom: 87 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1010 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 1020 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6725 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 825, Top: 2324 ft., Bottom: 6735 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2211 ft.
MESAVERDE3748 ft.
OHIO CREEK3748 ft.
WILLIAMS FORK3891 ft.
CAMEO6170 ft.
ROLLINS6639 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/7/2019                  Interval Top: 5025 ft.    Interval Bottom: 6590 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/7/2020Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/28/2019Treatment End Date:12/5/2019
Treatment Summary:34258 bbls of Slickwater; 509 gals of biocide
Total fluid used in treatment (bbls):34270Max pressure during treatment (psi):6837
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.67
Recycled water used in treatment (bbls):34258Total flowback volume recovered (bbls):21867
Fresh water used in treatment (bbls):12Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6449 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/7/2019Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1086
CALC_MCF_GAS 1500
CASING_PRESS 527
MCF_GAS 1500
TUBING_PRESS 527
Perforation Data:
Interval Top:5025 ft.# Of Holes:165
Interval Bottom:6590 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)26
Total Gas Produced (MCF)19345
GOR744038
GOR DeterminationMCFE
Average BOE per Day9.210
Average MCFE per Day53.414

 Federal Financial Assurance  i 

 Tribal Well  i No