Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24032
Well Classification: GW Status: PR - 10/29/2019
Well Name/No:FEDERAL #RWF 513-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC62160
Facility Status:PRStatus Date10/29/2019
FacilityID:457060LocationID:335744
County:GARFIELD #045Location:LOT 4 17 6S94W 6
Field:RULISON - #75400Elevation:6175 ft.
Basin:PICEANCE BASIN  
Planned Location:482FNL  12 FWLLat/Long: 39.531106 / -107.921256Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.531106 / -107.921255Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/24/2019
End Date: 10/3/2019
Reported: 10/30/2019
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/29/2019             Measured TD: 9355 ft.    Vertical TD: 9012 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/29/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/30/2020
Proposed Top PZ Location:Sec:8 Twp: 6S 94W Footage: 1402 FSL  650 FWL
Bottom Hole Location:Sec:8 Twp: 6S 94W Footage: 1402 FSL  650 FWL
Proposed Depth/Form:9362 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.4 , Citings Type: PLANNED
Cement:Sacks: 134, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 266, Top: 0 ft., Bottom: 1100 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9362 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1127, Top: 4727 ft., Bottom: 9362 ft.

Wellbore Completed
Completion Date:7/26/2019
Spud Date:7/20/2019Spud Date Is:ACTUAL
Measured TD:9355 ft.Measured PB depth:9324 ft.
True Vertical TD:9012 ft.True Vertical PB depth:8982 ft.
Top PZ Location:Sec:8 Twp: 6S 94WFootage: 1380 FSL  653 FWL
Bottom Hole Location:Sec:8 Twp: 6S 94WFootage: 1371 FSL  628 FWL
Log Types:CBL, NEU, (Triple Combo in API 045-24035)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 140, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1103 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1103 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9355 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1990, Top: 318 ft., Bottom: 9355 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2892 ft.
WASATCH4805 ft.
MESAVERDE5544 ft.
OHIO CREEK5544 ft.
WILLIAMS FORK5636 ft.
CAMEO8346 ft.
ROLLINS9220 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/29/2019                Interval Top: 6517 ft.    Interval Bottom: 9158 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/29/2019Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/24/2019Treatment End Date:10/3/2019
Treatment Summary:119672 bbls of Slickwater; 3865 gals of biocide
Total fluid used in treatment (bbls):119764Max pressure during treatment (psi):8336
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.72
Recycled water used in treatment (bbls):119672Total flowback volume recovered (bbls):32578
Fresh water used in treatment (bbls):92Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8904 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/29/2019Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1085
CALC_MCF_GAS 1901
CASING_PRESS 2046
MCF_GAS 1901
TUBING_PRESS 1688
Perforation Data:
Interval Top:6517 ft.# Of Holes:315
Interval Bottom:9158 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)277
Total Gas Produced (MCF)111750
GOR403429
GOR DeterminationMCFE
Average BOE per Day53.571
Average MCFE per Day310.718

 Federal Financial Assurance  i Y

 Tribal Well  i No