Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24025
Well Classification: GW Status: PR - 3/20/2019
Well Name/No:FEDERAL #GM 12-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/20/2019
FacilityID:456873LocationID:334950
County:GARFIELD #045Location:SWNE 8 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6175 ft.
Basin:PICEANCE BASIN  
Planned Location:1679FNL  2382 FELLat/Long: 39.454433 / -108.130385Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.454433 / -108.130385Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/22/2019
End Date: 2/27/2019
Reported: 4/9/2019
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/20/2019             Measured TD: 7140 ft.    Vertical TD: 6531 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/20/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/26/2020
Proposed Top PZ Location:Sec:8 Twp: 7S 96W Footage: 1059 FNL  615 FWL
Bottom Hole Location:Sec:8 Twp: 7S 96W Footage: 1059 FNL  615 FWL
Proposed Depth/Form:7341 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-20 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 79 ft., Weight: 52.78 , Citings Type: PLANNED
Cement:Sacks: 187, Top: 0 ft., Bottom: 79 ft.
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 1000 ft., Weight: 54.5 , Citings Type: PLANNED
Cement:Sacks: 342, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 4.5 in., Top: 0 ft., Depth: 7200 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1292, Top: 3945 ft., Bottom: 7200 ft.

Wellbore Completed
Completion Date:12/19/2018
Spud Date:11/29/2018Spud Date Is:ACTUAL
Measured TD:7140 ft.Measured PB depth:7097 ft.
True Vertical TD:6531 ft.True Vertical PB depth:6454 ft.
Top PZ Location:Sec:8 Twp: 7S 96WFootage: 1052 FNL  637 FWL
Bottom Hole Location:Sec:8 Twp: 7S 96WFootage: 1067 FNL  586 FWL
Log Types:CBL, NEU, (DIL IN API 045-10516)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 103 ft., Weight: 52.78 , Citings Type: ACTUAL
Cement:Sacks: 172, Top: 0 ft., Bottom: 103 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 1007 ft., Weight: 54.5 , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 0 ft., Bottom: 1007 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 4.5 in., Top: 0 ft., Depth: 7130 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1905, Top: 1493 ft., Bottom: 7140 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2398 ft.
MESAVERDE4150 ft.
OHIO CREEK4150 ft.
WILLIAMS FORK4383 ft.
CAMEO6740 ft.
ROLLINS7104 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/20/2019                 Interval Top: 5481 ft.    Interval Bottom: 7032 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/20/2019Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/22/2019Treatment End Date:2/27/2019
Treatment Summary:53403 bbLs of Slickwater; 721 gals of biocide
Total fluid used in treatment (bbls):53420Max pressure during treatment (psi):7437
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.68
Recycled water used in treatment (bbls):53403Total flowback volume recovered (bbls):15294
Fresh water used in treatment (bbls):17Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6867 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/20/2019Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1080
CALC_MCF_GAS 1800
CASING_PRESS 1350
MCF_GAS 1800
TUBING_PRESS 1050
Perforation Data:
Interval Top:5481 ft.# Of Holes:189
Interval Bottom:7032 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)67
Total Gas Produced (MCF)47618
GOR710716
GOR DeterminationMCFE
Average BOE per Day22.676
Average MCFE per Day131.508

 Federal Financial Assurance  i Y

 Tribal Well  i No