|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 3/20/2019 Measured TD: 7319 ft. Vertical TD: 6606 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 3/20/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/26/2020 | | Proposed Top PZ Location: | Sec:8 Twp: 7S 96W | Footage: 445 FNL 624 FWL | | Bottom Hole Location: | Sec:8 Twp: 7S 96W | Footage: 445 FNL 624 FWL | | Proposed Depth/Form: | 7529 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-20 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 79 ft., Weight: 52.78 , Citings Type: PLANNED | | Cement: | Sacks: 187, Top: 0 ft., Bottom: 79 ft. | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 1000 ft., Weight: 54.5 , Citings Type: PLANNED | | Cement: | Sacks: 342, Top: 0 ft., Bottom: 1000 ft. | | Casing: | String Type: 1ST, Hole Size: 12.25 in., Size: 4.5 in., Top: 0 ft., Depth: 7337 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1299, Top: 4066 ft., Bottom: 7337 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/25/2018 | | Spud Date: | 12/1/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 7319 ft. | Measured PB depth: | 7279 ft. | | True Vertical TD: | 6606 ft. | True Vertical PB depth: | 6526 ft. | | Top PZ Location: | Sec:8 Twp: 7S 96W | Footage: 444 FNL 654 FWL | | Bottom Hole Location: | Sec:8 Twp: 7S 96W | Footage: 464 FNL 606 FWL | | Log Types: | CBL, NEU, (DIL in API 045-10516) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 103 ft., Weight: 52.78 , Citings Type: ACTUAL | | Cement: | Sacks: 172, Top: 0 ft., Bottom: 103 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 1037 ft., Weight: 54.5 , Citings Type: ACTUAL | | Cement: | Sacks: 390, Top: 0 ft., Bottom: 1037 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7309 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 840, Top: 2038 ft., Bottom: 7319 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 2454 ft. | | | | | MESAVERDE | 4245 ft. | | | | | OHIO CREEK | 4245 ft. | | | | | WILLIAMS FORK | 4469 ft. | | | | | CAMEO | 6857 ft. | | | | | ROLLINS | 7225 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 3/20/2019 Interval Top: 5610 ft. Interval Bottom: 7173 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 3/20/2019 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/20/2019 | Treatment End Date: | 2/26/2019 | | Treatment Summary: | 55610 bbLs of Slickwater; 774 gals of biocide | | Total fluid used in treatment (bbls): | 55628 | Max pressure during treatment (psi): | 6075 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 9 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.61 | | Recycled water used in treatment (bbls): | 55610 | Total flowback volume recovered (bbls): | 18058 | | Fresh water used in treatment (bbls): | 18 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7031 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/20/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1080 | | CALC_MCF_GAS | 1800 | | CASING_PRESS | 1400 | | MCF_GAS | 1800 | | TUBING_PRESS | 1200 |
| | Perforation Data: | | Interval Top: | 5610 ft. | # Of Holes: | 192 | | Interval Bottom: | 7173 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 90 |
| Total Gas Produced (MCF) | 57709 |
| GOR | 641211 |
| GOR Determination | MCFE |
| Average BOE per Day | 27.504 |
| Average MCFE per Day | 159.516 |
| Federal Financial Assurance | i | Y |
|
|