|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/8/2019 Measured TD: 11815 ft. Vertical TD: 11576 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/8/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/7/2020 | | Proposed Top PZ Location: | Sec:2 Twp: 5S 96W | Footage: 122 FNL 633 FWL | | Bottom Hole Location: | Sec:2 Twp: 5S 96W | Footage: 152 FNL 551 FWL | | Proposed Depth/Form: | 11823 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: 36# , Citings Type: PLANNED | | Cement: | Sacks: 860, Top: 0 ft., Bottom: 3000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11823 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 1046, Top: 5891 ft., Bottom: 11823 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/30/2019 | | Spud Date: | 3/22/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 11815 ft. | Measured PB depth: | 11749 ft. | | True Vertical TD: | 11576 ft. | True Vertical PB depth: | 11511 ft. | | Top PZ Location: | Sec:2 Twp: 5S 96W | Footage: 228 FNL 596 FWL | | Bottom Hole Location: | Sec:2 Twp: 5S 96W | Footage: 219 FNL 409 FWL | | Log Types: | CBL, Pulsed Neutron, (Triple Combo on 045-13024). | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2840 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 880, Top: 17 ft., Bottom: 2840 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11793 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1684, Top: 3638 ft., Bottom: 11815 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 17 ft., Bottom: 17 ft., Sacks: 605, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | | N | N | | WASATCH | 3194 ft. | | N | N | | WASATCH G | 5574 ft. | | N | N | | FORT UNION | 6121 ft. | | N | N | | OHIO CREEK | 8130 ft. | | N | N | | WILLIAMS FORK | 8417 ft. | | N | N | | CAMEO | 10855 ft. | | N | N | | ROLLINS | 11663 ft. | | N | N |
Formation WFOCCM Formation Classification: GW Status: PR - 7/8/2019 Interval Top: 8141 ft. Interval Bottom: 11626 ft.| Completed Information for Formation WILLIAMS FORK-OHIO CREEK-CAMEO | | 1st Production Date: | 7/8/2019 | Choke Size: | | | Formation Name: | WILLIAMS FORK-OHIO CREEK-CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/21/2019 | Treatment End Date: | 7/3/2019 | | Treatment Summary: | 14-stage plug-and-perf completion;
269990 total bbls fluid pumped: 153995 bbls recycled water (slickwater), 115828 bbls fresh water (slickwater), and 167 bbls 7.5% HCl acid;
no proppant used.
| | Total fluid used in treatment (bbls): | 269990 | Max pressure during treatment (psi): | 8500 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.44 | | Type Of gas: | | Number Of staged intervals: | 14 | | Total acid used in treatment (bbls): | 167 | Min frac gradient (psi/ft): | 0.58 | | Recycled water used in treatment (bbls): | 153995 | Total flowback volume recovered (bbls): | 143827 | | Fresh water used in treatment (bbls): | 115828 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/8/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1018 | | BTU_GAS | 1020 | | CALC_BBLS_H2O | 1018 | | CALC_MCF_GAS | 125 | | CASING_PRESS | 2913 | | MCF_GAS | 125 |
| | Perforation Data: | | Interval Top: | 8141 ft. | # Of Holes: | 378 | | Interval Bottom: | 11626 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 467 |
| Total Gas Produced (MCF) | 81623 |
| GOR | 174781 |
| GOR Determination | MCFE |
| Average BOE per Day | 39.848 |
| Average MCFE per Day | 231.099 |
| Federal Financial Assurance | i | |
|
|