|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/26/2019 Measured TD: 11430 ft. Vertical TD: 11346 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/26/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/7/2020 | | Proposed Top PZ Location: | Sec:3 Twp: 5S 96W | Footage: 2233 FNL 1168 FEL | | Bottom Hole Location: | Sec:3 Twp: 5S 96W | Footage: 2262 FNL 1250 FEL | | Proposed Depth/Form: | 11430 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: 36# , Citings Type: PLANNED | | Cement: | Sacks: 995, Top: 0 ft., Bottom: 3000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11430 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 950, Top: 6010 ft., Bottom: 11430 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/12/2019 | | Spud Date: | 1/4/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 11430 ft. | Measured PB depth: | 11408 ft. | | True Vertical TD: | 11346 ft. | True Vertical PB depth: | 11324 ft. | | Top PZ Location: | Sec:3 Twp: 5S 96W | Footage: 2268 FNL 1138 FEL | | Bottom Hole Location: | Sec:3 Twp: 5S 96W | Footage: 2339 FNL 1317 FEL | | Log Types: | CBL, Pulsed Neutron, (Triple Combo on 045-13024). | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2986 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 877, Top: 153 ft., Bottom: 2986 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11410 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 967, Top: 9170 ft., Bottom: 11430 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 7626 ft., Depth: 7694 ft., Bottom: 8036 ft., Sacks: 192, Method: SQUEEZE | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 153 ft., Bottom: 153 ft., Sacks: 200, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREENHORN | 0 ft. | | N | N | | WASATCH | 3145 ft. | | N | N | | WASATCH G | 5436 ft. | | N | N | | FORT UNION | 5893 ft. | | N | N | | OHIO CREEK | 7879 ft. | | N | N | | WILLIAMS FORK | 8120 ft. | | N | N | | CAMEO | 10603 ft. | | N | N | | ROLLINS | 11361 ft. | | N | N |
Formation WFOCCM Formation Classification: GW Status: PR - 12/26/2019 Interval Top: 7940 ft. Interval Bottom: 11279 ft.| Completed Information for Formation WILLIAMS FORK-OHIO CREEK-CAMEO | | 1st Production Date: | 12/26/2019 | Choke Size: | | | Formation Name: | WILLIAMS FORK-OHIO CREEK-CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/14/2019 | Treatment End Date: | 12/23/2019 | | Treatment Summary: | 14-stage plug-and-perf completion;
229348 total bbls fluid pumped: 229200 bbls recycled water (slickwater) and 148 bbls 7.5% HCl acid;
no proppant used. | | Total fluid used in treatment (bbls): | 229348 | Max pressure during treatment (psi): | 8000 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 14 | | Total acid used in treatment (bbls): | 148 | Min frac gradient (psi/ft): | 0.74 | | Recycled water used in treatment (bbls): | 229200 | Total flowback volume recovered (bbls): | 49500 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/26/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1488 | | BTU_GAS | 1026 | | CALC_BBLS_H2O | 1488 | | CALC_MCF_GAS | 88 | | CASING_PRESS | 896 | | MCF_GAS | 88 |
| | Perforation Data: | | Interval Top: | 7940 ft. | # Of Holes: | 378 | | Interval Bottom: | 11279 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 313 |
| Total Gas Produced (MCF) | 52027 |
| GOR | 166220 |
| GOR Determination | MCFE |
| Average BOE per Day | 25.526 |
| Average MCFE per Day | 148.071 |
| Federal Financial Assurance | i | |
|
|