|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/14/2020 Measured TD: 9488 ft. Vertical TD: 9475 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/14/2020 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/28/2020 | Proposed Top PZ Location: | Sec:4 Twp: 6S 97W | Footage: 2156 FNL 1306 FEL | Bottom Hole Location: | Sec:4 Twp: 6S 97W | Footage: 2156 FNL 1306 FEL | Proposed Depth/Form: | 9543 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 510-71 , Unit Acreage: 488, Drill Unit: Sec 4 Lots 5-16 | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-71 , Unit Acreage: 488, Drill Unit: Sec 4 Lots 5-16 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.44 , Citings Type: PLANNED | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 14.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2530 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 1237, Top: 0 ft., Bottom: 2530 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9558 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 1447, Top: 2030 ft., Bottom: 9558 ft. |
| | |
Wellbore Completed | Completion Date: | 5/14/2019 | Spud Date: | 5/11/2019 | Spud Date Is: | ACTUAL | Measured TD: | 9488 ft. | Measured PB depth: | 9383 ft. | True Vertical TD: | 9475 ft. | True Vertical PB depth: | 9344 ft. | Top PZ Location: | Sec:4 Twp: 6S 97W | Footage: 2132 FNL 1250 FEL | Bottom Hole Location: | Sec:4 Twp: 6S 97W | Footage: 2167 FNL 1338 FEL | Log Types: | Pulsed Neutron, GR, CBL, Mud (RES in API 45-23987) | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.9 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: CALC | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2572 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 1130, Top: 0 ft., Bottom: 2572 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9478 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1447, Top: 2910 ft., Bottom: 9478 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 0 ft., Depth: , Bottom: , Sacks: 30, Method: 1 INCH | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: , Bottom: 2572 ft., Sacks: 70, Method: 1 INCH | Formation | Interval Top | Log Bottom | Cored | DSTs | WASATCH | 2912 ft. | 4719 ft. | N | N | WASATCH G | 4719 ft. | 5215 ft. | N | N | FORT UNION | 5215 ft. | 6435 ft. | N | N | OHIO CREEK | 6435 ft. | 6854 ft. | N | N | WILLIAMS FORK | 6854 ft. | 8913 ft. | N | N | CAMEO | 8913 ft. | 9310 ft. | N | N | ROLLINS | 9310 ft. | 9773 ft. | N | N | CORCORAN | 9773 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 1/14/2020 Interval Top: 7302 ft. Interval Bottom: 9270 ft. Completed Information for Formation WILLIAMS FORK - CAMEO | 1st Production Date: | 1/11/2019 | Choke Size: | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 12/6/2019 | Treatment End Date: | 12/19/2019 | Treatment Summary: | 74,000 bbls fluid; no proppant | Total fluid used in treatment (bbls): | 74000 | Max pressure during treatment (psi): | 6487 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.40 | Type Of gas: | | Number Of staged intervals: | 8 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.48 | Recycled water used in treatment (bbls): | 42920 | Total flowback volume recovered (bbls): | 50656 | Fresh water used in treatment (bbls): | 31080 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8775 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/14/2020 | Test Method: | Flowing | Hours Tested: | 1 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1035 | CALC_MCF_GAS | 1157 | CASING_PRESS | 1998 | MCF_GAS | 49 | TUBING_PRESS | 1343 |
| Perforation Data: | Interval Top: | 7302 ft. | # Of Holes: | 234 | Interval Bottom: | 9270 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 125 |
Total Gas Produced (MCF) | 71607 |
GOR | 572856 |
GOR Determination | MCFE |
Average BOE per Day | 34.106 |
Average MCFE per Day | 197.831 |
Federal Financial Assurance | i | Y |
|
|