Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23987
Well Classification: GW Status: PR - 1/14/2020
Well Name/No:CC #0697-04-08E
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:LARAMIE ENERGY LLC - 10433
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/14/2020
FacilityID:455745LocationID:335902
County:GARFIELD #045Location:Lot 12 4 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8602 ft.
Planned Location:1952FNL  947 FELLat/Long: 39.557467 / -108.218839Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.557468 / -108.218838Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/7/2019
End Date: 12/20/2019
Reported: 1/17/2020
Days to report: 28
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/14/2020             Measured TD: 9953 ft.    Vertical TD: 9937 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/14/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/28/2020
Proposed Top PZ Location:Sec:4 Twp: 6S 97W Footage: 1907 FNL  1307 FEL
Bottom Hole Location:Sec:4 Twp: 6S 97W Footage: 1907 FNL  1307 FEL
Proposed Depth/Form:9451 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: ILES , Formation: ILES , Order: 510-71 , Unit Acreage: 488, Drill Unit: Sec 4 Lot 5-16
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-71 , Unit Acreage: 488, Drill Unit: Sec 4 Lot 5-16
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.44 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 14.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2530 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1237, Top: 0 ft., Bottom: 2530 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9978 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1525, Top: 2030 ft., Bottom: 9978 ft.

Wellbore Completed
Completion Date:5/19/2019
Spud Date:5/15/2019Spud Date Is:ACTUAL
Measured TD:9953 ft.Measured PB depth:9848 ft.
True Vertical TD:9937 ft.True Vertical PB depth:9816 ft.
Top PZ Location:Sec:4 Twp: 6S 97WFootage: 1880 FNL  1250 FEL
Bottom Hole Location:Sec:4 Twp: 6S 97WFootage: 1947 FNL  1382 FEL
Log Types:GR, INDUCTION, CALIPER, Triple Combo, Pulsed Neutron, RBL, Mud, CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.9 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2568 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1130, Top: 0 ft., Bottom: 2568 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9943 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1525, Top: 3105 ft., Bottom: 9943 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: , Bottom: , Sacks: 30, Method: 1 INCH
Additional Cement:String Type: SURF , Top: 0 ft., Depth: , Bottom: 2568 ft., Sacks: 167, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
WASATCH2843 ft.4715 ft.NN
WASATCH G4715 ft.4988 ft.NN
FORT UNION4988 ft.6444 ft.NN
OHIO CREEK6444 ft.6861 ft.NN
WILLIAMS FORK6861 ft.8916 ft.NN
CAMEO8916 ft.9315 ft.NN
ROLLINS9315 ft.9545 ft.NN
COZZETTE9545 ft.9780 ft.NN
CORCORAN9780 ft.NN

Formation COZZ                     Formation Classification:  GW                     Status:  PR - 1/13/2020                 Interval Top: 9552 ft.    Interval Bottom: 9654 ft.

 Completed Information for Formation COZZETTE
1st Production Date:1/13/2020Choke Size: 
Formation Name:COZZETTECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/5/2019Treatment End Date:12/5/2019
Treatment Summary:10,000 bbls fluid; no proppant
Total fluid used in treatment (bbls):10000Max pressure during treatment (psi):5033
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.60
Recycled water used in treatment (bbls):5900Total flowback volume recovered (bbls):5475
Fresh water used in treatment (bbls):4100Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9557 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/13/2020Test Method:Flowing
Hours Tested:1Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1039
CALC_MCF_GAS 80
CASING_PRESS 1962
MCF_GAS 3
TUBING_PRESS 1217
Perforation Data:
Interval Top:9552 ft.# Of Holes:24
Interval Bottom:9654 ft.Hole Size:0.37 in.

Formation WFCM                     Formation Classification:  OG                     Status:  PR - 1/14/2020                 Interval Top: 7266 ft.    Interval Bottom: 9282 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/13/2020Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/9/2019Treatment End Date:12/20/2019
Treatment Summary:74,000 bbls fluid; no proppant
Total fluid used in treatment (bbls):74000Max pressure during treatment (psi):6552
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.49
Recycled water used in treatment (bbls):43660Total flowback volume recovered (bbls):45897
Fresh water used in treatment (bbls):30340Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9557 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/14/2020Test Method:Flowing
Hours Tested:1Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1039
CALC_MCF_GAS 720
CASING_PRESS 1962
MCF_GAS 30
TUBING_PRESS 1217
Perforation Data:
Interval Top:7266 ft.# Of Holes:234
Interval Bottom:9282 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)95
Total Gas Produced (MCF)57767
GOR608073
GOR DeterminationMCFE
Average BOE per Day27.541
Average MCFE per Day159.736

 Federal Financial Assurance  i Y

 Tribal Well  i No