|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/8/2019 Measured TD: 9567 ft. Vertical TD: 9511 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/8/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/28/2020 | | Proposed Top PZ Location: | Sec:4 Twp: 6S 97W | Footage: 1157 FNL 1308 FEL | | Bottom Hole Location: | Sec:4 Twp: 6S 97W | Footage: 1157 FNL 1308 FEL | | Proposed Depth/Form: | 9623 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 510-71 , Unit Acreage: 488, Drill Unit: Sec 4 Lots 5-16 | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-71 , Unit Acreage: 488, Drill Unit: Sec 4 Lots 5-16 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.44 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2530 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1237, Top: 0 ft., Bottom: 2530 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9628 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1461, Top: 2030 ft., Bottom: 9628 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/8/2019 | | Spud Date: | 6/3/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 9567 ft. | Measured PB depth: | 9461 ft. | | True Vertical TD: | 9511 ft. | True Vertical PB depth: | 9406 ft. | | Top PZ Location: | Sec:4 Twp: 6S 97W | Footage: 1146 FNL 1241 FEL | | Bottom Hole Location: | Sec:4 Twp: 6S 97W | Footage: 1197 FNL 1322 FEL | | Log Types: | NEU, GR, CBL, Mud (Triple Combo in 045-23987) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.9 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2660 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1173, Top: 301 ft., Bottom: 2660 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9557 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1505, Top: 2316 ft., Bottom: 9567 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 301 ft., Bottom: 301 ft., Sacks: 296, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 2957 ft. | | N | N | | WASATCH G | 4744 ft. | | N | N | | FORT UNION | 5269 ft. | | N | N | | OHIO CREEK | 6491 ft. | | N | N | | WILLIAMS FORK | 6911 ft. | | N | N | | CAMEO | 8958 ft. | | N | N | | ROLLINS | 9397 ft. | | N | N | | CORCORAN | 9891 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 12/8/2019 Interval Top: 7362 ft. Interval Bottom: 9352 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 12/5/2019 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/5/2019 | Treatment End Date: | 11/19/2019 | | Treatment Summary: | 74,000 bbls water; no proppant | | Total fluid used in treatment (bbls): | 74000 | Max pressure during treatment (psi): | 6407 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.40 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.48 | | Recycled water used in treatment (bbls): | 71828 | Total flowback volume recovered (bbls): | 45064 | | Fresh water used in treatment (bbls): | 2172 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8856 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/8/2019 | Test Method: | Flowing | | Hours Tested: | 1 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1026 | | CALC_MCF_GAS | 613 | | CASING_PRESS | 2125 | | MCF_GAS | 26 | | TUBING_PRESS | 1181 |
| | Perforation Data: | | Interval Top: | 7362 ft. | # Of Holes: | 234 | | Interval Bottom: | 9352 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 108 |
| Total Gas Produced (MCF) | 54278 |
| GOR | 502574 |
| GOR Determination | MCFE |
| Average BOE per Day | 25.912 |
| Average MCFE per Day | 150.284 |
| Federal Financial Assurance | i | Y |
|
|