|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/22/2019 Measured TD: 9685 ft. Vertical TD: 9552 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/22/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 6/28/2020 | Proposed Top PZ Location: | Sec:4 Twp: 6S 97W | Footage: 656 FNL 1309 FEL | Bottom Hole Location: | Sec:4 Twp: 6S 97W | Footage: 656 FNL 1309 FEL | Proposed Depth/Form: | 9711 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEDERAL | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 510-71 , Unit Acreage: 488, Drill Unit: Sec 4 Lots 5-16 | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-71 , Unit Acreage: 488, Drill Unit: Sec 4 Lots 5-16 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 60 ft., Weight: 112 , Citings Type: PLANNED | Cement: | Sacks: 100, Top: 0 ft., Bottom: 60 ft. | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2524 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 1132, Top: 0 ft., Bottom: 2524 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9711 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 1722, Top: 2024 ft., Bottom: 9711 ft. |
| | |
Wellbore Completed | Completion Date: | 6/18/2019 | Spud Date: | 6/13/2019 | Spud Date Is: | ACTUAL | Measured TD: | 9685 ft. | Measured PB depth: | 9589 ft. | True Vertical TD: | 9552 ft. | True Vertical PB depth: | 9420 ft. | Top PZ Location: | Sec:4 Twp: 6S 97W | Footage: 650 FNL 1251 FEL | Bottom Hole Location: | Sec:4 Twp: 6S 97W | Footage: 686 FNL 1373 FEL | Log Types: | Pulsed Neutron, GR, CBL, Mud (Triple Combo in API 045-23987) | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.9 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: CALC | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2591 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 1130, Top: 0 ft., Bottom: 2591 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9675 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1543, Top: 2600 ft., Bottom: 9675 ft., Determination Method: CBL | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: , Bottom: 2591 ft., Sacks: 264, Method: 1 INCH | Formation | Interval Top | Log Bottom | Cored | DSTs | WASATCH | 2998 ft. | 4797 ft. | N | N | WASATCH G | 4797 ft. | 5337 ft. | N | N | FORT UNION | 5337 ft. | 6574 ft. | N | N | OHIO CREEK | 6574 ft. | 6959 ft. | N | N | WILLIAMS FORK | 6959 ft. | 9066 ft. | N | N | CAMEO | 9066 ft. | 9489 ft. | N | N | ROLLINS | 9489 ft. | 9969 ft. | N | N | CORCORAN | 9969 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 10/22/2019 Interval Top: 7400 ft. Interval Bottom: 9458 ft. Completed Information for Formation WILLIAMS FORK - CAMEO | 1st Production Date: | 10/22/2019 | Choke Size: | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 9/21/2019 | Treatment End Date: | 10/20/2019 | Treatment Summary: | 68,000 bbls slickwater; no proppant | Total fluid used in treatment (bbls): | 68000 | Max pressure during treatment (psi): | 6435 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.40 | Type Of gas: | | Number Of staged intervals: | 8 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.46 | Recycled water used in treatment (bbls): | 68000 | Total flowback volume recovered (bbls): | 40949 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8959 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/22/2019 | Test Method: | Flowing | Hours Tested: | 1 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 30 | BTU_GAS | 1066 | CALC_BBLS_H2O | 726 | CALC_MCF_GAS | 940 | CASING_PRESS | 1089 | MCF_GAS | 39 | TUBING_PRESS | 1874 |
| Perforation Data: | Interval Top: | 7400 ft. | # Of Holes: | 231 | Interval Bottom: | 9458 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 99 |
Total Gas Produced (MCF) | 55158 |
GOR | 557151 |
GOR Determination | MCFE |
Average BOE per Day | 26.313 |
Average MCFE per Day | 152.613 |
Federal Financial Assurance | i | Y |
|
|