|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 12/31/2020 Measured TD: 9510 ft. Vertical TD: 9363 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 12/31/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/19/2019 | | Proposed Top PZ Location: | Sec:10 Twp: 5S 96W | Footage: 1129 FSL 1314 FWL | | Bottom Hole Location: | Sec:10 Twp: 5S 96W | Footage: 1129 FSL 1314 FWL | | Proposed Depth/Form: | 9504 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2000 ft., Weight: 36# , Citings Type: PLANNED | | Cement: | Sacks: 787, Top: 0 ft., Bottom: 2000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9504 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 960, Top: 4097 ft., Bottom: 9504 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/22/2018 | | Spud Date: | 2/16/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 9510 ft. | Measured PB depth: | 9442 ft. | | True Vertical TD: | 9363 ft. | True Vertical PB depth: | 9295 ft. | | Bottom Hole Location: | Sec:10 Twp: 5S 96W | Footage: 1102 FSL 1237 FWL | | Log Types: | CBL, PNL (Triple combo on 045-23777) | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 218 ft., Weight: 54# , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 218 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2020 ft., Weight: 36# , Citings Type: ACTUAL | | Cement: | Sacks: 478, Top: 0 ft., Bottom: 2020 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9486 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 884, Top: 4800 ft., Bottom: 9486 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: , Bottom: 92 ft., Sacks: 25, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | | N | N | | WASATCH G | 3706 ft. | | N | N | | FORT UNION | 4210 ft. | | N | N | | OHIO CREEK | 6074 ft. | | N | N | | WILLIAMS FORK | 6363 ft. | | N | N | | CAMEO | 8715 ft. | | N | N | | ROLLINS | 9349 ft. | | N | N | | No formation data to display. |
|
|
|
|
|
|
| Reported Plugged | Y | 12/31/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|