Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23772
Well Classification: GW Status: PR - 9/1/2025
Well Name/No:NPR #24C-10-596
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2025
FacilityID:452671LocationID:335676
County:GARFIELD #045Location:NESW 10 5S96W 6
Field:GRAND VALLEY - #31290Elevation:6708 ft.
Basin:PICEANCE BASIN  
Planned Location:1873FSL  2529 FWLLat/Long: 39.627469 / -108.155806Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.627470 / -108.155806Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/24/2018
End Date: 12/10/2018
Reported: 7/29/2019
Days to report: 231
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/1/2025             Measured TD: 9757 ft.    Vertical TD: 9510 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/19/2019
Proposed Top PZ Location:Sec:10 Twp: 5S 96W Footage: 1432 FSL  1310 FEL
Bottom Hole Location:Sec:10 Twp: 5S 96W Footage: 1432 FSL  1310 FEL
Proposed Depth/Form:9794 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 1209, Top: 0 ft., Bottom: 3000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9794 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 985, Top: 4254 ft., Bottom: 9794 ft.

Wellbore Completed
Completion Date:6/20/2018
Spud Date:6/13/2018Spud Date Is:ACTUAL
Measured TD:9757 ft.Measured PB depth:9694 ft.
True Vertical TD:9510 ft.True Vertical PB depth:9447 ft.
Top PZ Location:Sec:10 Twp: 5S 96WFootage: 1441 FSL  1202 FEL
Bottom Hole Location:Sec:10 Twp: 5S 96WFootage: 1398 FSL  1381 FEL
Log Types:CBL, Pulsed Neutron, (Triple Combo on 045-23777).
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2960 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 869, Top: 0 ft., Bottom: 2975 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9743 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 938, Top: 5030 ft., Bottom: 9743 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.NN
WASATCH G3851 ft.NN
FORT UNION4318 ft.NN
OHIO CREEK6158 ft.NN
WILLIAMS FORK6521 ft.NN
CAMEO8929 ft.NN
ROLLINS9660 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/1/2025                  Interval Top: 6546 ft.    Interval Bottom: 9615 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/26/2018Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/24/2018Treatment End Date:12/10/2018
Treatment Summary:13-stage plug-and-perf completion; 234000 total bbls fluid pumped: 233845 bbls recycled water (slickwater) and 155 bbls 7.5% HCl acid; no proppant used.
Total fluid used in treatment (bbls):234000Max pressure during treatment (psi):8551
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):155Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):233845Total flowback volume recovered (bbls):13089
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8846 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/26/2018Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2122
BTU_GAS 1080
CALC_BBLS_H2O 2122
CALC_MCF_GAS 90
CASING_PRESS 1438
MCF_GAS 90
Perforation Data:
Interval Top:6546 ft.# Of Holes:351
Interval Bottom:9615 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)92
Total Gas Produced (MCF)14387
GOR156380
GOR DeterminationMCFE
Average BOE per Day7.055
Average MCFE per Day40.941

 Federal Financial Assurance  i 

 Tribal Well  i No