Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23766
Well Classification: GW Status: PR - 12/11/2018
Well Name/No:NPR #13B-10-596
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/11/2018
FacilityID:452665LocationID:335676
County:GARFIELD #045Location:NESW 10 5S96W 6
Field:GRAND VALLEY - #31290Elevation:6709 ft.
Basin:PICEANCE BASIN  
Planned Location:1915FSL  2449 FWLLat/Long: 39.627586 / -108.156089Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.627587 / -108.156090Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/21/2018
End Date: 12/9/2018
Reported: 7/29/2019
Days to report: 232
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/11/2018             Measured TD: 9578 ft.    Vertical TD: 9386 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/11/2018
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/19/2019
Proposed Top PZ Location:Sec:10 Twp: 5S 96W Footage: 2612 FNL  1322 FWL
Bottom Hole Location:Sec:10 Twp: 5S 96W Footage: 2612 FNL  1322 FWL
Proposed Depth/Form:9579 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2000 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 787, Top: 0 ft., Bottom: 2000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9579 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 970, Top: 4121 ft., Bottom: 9579 ft.

Wellbore Completed
Completion Date:7/24/2018
Spud Date:7/19/2018Spud Date Is:ACTUAL
Measured TD:9578 ft.Measured PB depth:9502 ft.
True Vertical TD:9386 ft.True Vertical PB depth:9310 ft.
Top PZ Location:Sec:10 Twp: 5S 96WFootage: 2553 FNL  1465 FWL
Bottom Hole Location:Sec:10 Twp: 5S 96WFootage: 2567 FNL  1313 FWL
Log Types:CBL, Pulsed Neutron, (Triple Combo on 045-23777).
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2390 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 678, Top: 0 ft., Bottom: 2401 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9546 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 898, Top: 4968 ft., Bottom: 9578 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.NN
WASATCH G3784 ft.NN
FORT UNION4242 ft.NN
OHIO CREEK6077 ft.NN
WILLIAMS FORK6377 ft.NN
CAMEO8774 ft.NN
ROLLINS9446 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/11/2018                Interval Top: 6437 ft.    Interval Bottom: 9403 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/11/2018Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/23/2018Treatment End Date:12/8/2018
Treatment Summary:13-stage plug-and-perf completion; 234001 total bbls fluid pumped: 233846 bbls recycled water (slickwater) and 155 bbls 7.5% HCl acid; no proppant used.
Total fluid used in treatment (bbls):234001Max pressure during treatment (psi):8083
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):155Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):233846Total flowback volume recovered (bbls):73392
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8667 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/11/2018Test Method:
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2709
BTU_GAS 1080
CALC_BBLS_H2O 2709
CALC_MCF_GAS 74
CASING_PRESS 1074
MCF_GAS 74
Perforation Data:
Interval Top:6437 ft.# Of Holes:351
Interval Bottom:9403 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)336
Total Gas Produced (MCF)61804
GOR183940
GOR DeterminationMCFE
Average BOE per Day30.133
Average MCFE per Day174.764

 Federal Financial Assurance  i 

 Tribal Well  i No