Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23724
Well Classification: GW Status: PR - 9/3/2018
Well Name/No:FEDERAL #PA 34-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 073094
Facility Status:PRStatus Date9/3/2018
FacilityID:452377LocationID:335330
County:GARFIELD #045Location:NESW 26 6S95W 6
Field:PARACHUTE - #67350Elevation:5637 ft.
Basin:PICEANCE BASIN  
Planned Location:2128FSL  2423 FWLLat/Long: 39.494356 / -107.966857Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.494357 / -107.966857Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/31/2018
End Date: 8/8/2018
Reported: 8/21/2018
Days to report: 13
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/3/2018             Measured TD: 8383 ft.    Vertical TD: 8283 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/3/2018
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/26/2019
Proposed Top PZ Location:Sec:26 Twp: 6S 95W Footage: 1352 FSL  2260 FEL
Bottom Hole Location:Sec:26 Twp: 6S 95W Footage: 1352 FSL  2260 FEL
Proposed Depth/Form:8411 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-79 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.4 , Citings Type: PLANNED
Cement:Sacks: 134, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 266, Top: 0 ft., Bottom: 1100 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8411 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1140, Top: 2189 ft., Bottom: 8411 ft.

Wellbore Completed
Completion Date:7/5/2018
Spud Date:6/29/2018Spud Date Is:ACTUAL
Measured TD:8383 ft.Measured PB depth:8339 ft.
True Vertical TD:8283 ft.True Vertical PB depth:8239 ft.
Top PZ Location:Sec:26 Twp: 6S 95WFootage: 1402 FSL  2267 FEL
Bottom Hole Location:Sec:26 Twp: 6S 95WFootage: 1326 FSL  2270 FEL
Log Types:CBL, PULSED NEUTRON (TRIPLE COMBO IN API 045-23709)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 104 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 174, Top: 0 ft., Bottom: 104 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1140 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1140 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8374 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1815, Top: 1201 ft., Bottom: 8383 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2412 ft.
WILLIAMS FORK4654 ft.
MESAVERDE4751 ft.
OHIO CREEK4751 ft.
CAMEO7819 ft.
ROLLINS8238 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/3/2018                  Interval Top: 5709 ft.    Interval Bottom: 8152 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/3/2018Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/31/2018Treatment End Date:8/8/2018
Treatment Summary:66168 bbls of slickwater; 1844028 100/Mesh; 2565 gals of biocide
Total fluid used in treatment (bbls):66229Max pressure during treatment (psi):7499
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:12
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.77
Recycled water used in treatment (bbls):66168Total flowback volume recovered (bbls):31063
Fresh water used in treatment (bbls):21Disposition method For flowback:RECYCLE
Total proppant used (lbs):1844028Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7920 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/3/2018Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1118
CALC_MCF_GAS 1361
CASING_PRESS 1708
MCF_GAS 1361
TUBING_PRESS 1177
Perforation Data:
Interval Top:5709 ft.# Of Holes:264
Interval Bottom:8152 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)106
Total Gas Produced (MCF)46004
GOR434000
GOR DeterminationMCFE
Average BOE per Day22.028
Average MCFE per Day127.756

 Federal Financial Assurance  i Y

 Tribal Well  i No