|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: Status: PR - 9/1/2025 Measured TD: | Wellbore Data for Original Wellbore | Wellbore Classification: PR - 9/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/9/2027 | | Proposed Top PZ Location: | Sec:28 Twp: 5S 97W | Footage: 2421 FNL 1320 FEL | | Bottom Hole Location: | Sec:28 Twp: 5S 97W | Footage: 2421 FNL 1320 FEL | | Proposed Depth/Form: | 9600 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 1-229 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: PLANNED | | Cement: | Sacks: 134, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3094 ft., Weight: 36.0 , Citings Type: PLANNED | | Cement: | Sacks: 740, Top: 0 ft., Bottom: 3094 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9600 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 900, Top: 4206 ft., Bottom: 9600 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 5/15/2025 | Spud Date Is: | NOTICE | | Measured TD: | | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec:28 Twp: 5S 97W | Footage: 2386 FNL 1268 FEL |
Formation SEGO Formation Classification: GW Status: PR - 1/29/2026 Interval Top: 9362 ft. Interval Bottom: 9535 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 10/16/2025 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 9/1/2025 | Treatment End Date: | 9/8/2025 | | Treatment Summary: | Iles Member | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 9362 ft. | # Of Holes: | 24 | | Interval Bottom: | 9535 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: GW Status: PR - 1/29/2026 Interval Top: 9166 ft. Interval Bottom: 9332 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 10/16/2025 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 9/1/2025 | Treatment End Date: | 9/8/2025 | | Treatment Summary: | Iles Member | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 9166 ft. | # Of Holes: | 19 | | Interval Bottom: | 9332 ft. | Hole Size: | 0.35 in. |
|
Formation COZZ Formation Classification: GW Status: PR - 1/29/2026 Interval Top: 8970 ft. Interval Bottom: 9165 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 10/16/2025 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 9/1/2025 | Treatment End Date: | 9/8/2025 | | Treatment Summary: | Iles Member | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 8970 ft. | # Of Holes: | 29 | | Interval Bottom: | 9165 ft. | Hole Size: | 0.35 in. |
|
Formation WFCCCS Formation Classification: GW Status: CM - 10/16/2025 Interval Top: 6652 ft. Interval Bottom: 9535 ft.| Completed Information for Formation WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | | 1st Production Date: | 10/16/2025 | Choke Size: | | | Formation Name: | WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 9/1/2025 | Treatment End Date: | 9/8/2025 | | Treatment Summary: | 188,859 bbls of Slickwater; 2029 gals (48 bbls) of Biocide | | Total fluid used in treatment (bbls): | 188907 | Max pressure during treatment (psi): | 7395 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | 13 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.53 | | Recycled water used in treatment (bbls): | 188859 | Total flowback volume recovered (bbls): | 42524 | | Fresh water used in treatment (bbls): | 48 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6643 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/16/2025 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1119 | | CALC_MCF_GAS | 715 | | CASING_PRESS | 2062 | | MCF_GAS | 715 | | TUBING_PRESS | 365 |
| | Perforation Data: | | Interval Top: | 6652 ft. | # Of Holes: | 312 | | Interval Bottom: | 9535 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 1/29/2026 Interval Top: 6652 ft. Interval Bottom: 8731 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 10/16/2025 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 9/1/2025 | Treatment End Date: | 9/8/2025 | | Treatment Summary: | Williams Fork: 6652' - 8470' with 206 holes
Cameo: 8471' - 8731' with 34 holes | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 6652 ft. | # Of Holes: | 240 | | Interval Bottom: | 8731 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 13469 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 6.338 |
| Average MCFE per Day | 36.762 |
| Federal Financial Assurance | i | |
|
|