Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23506
Well Classification: GW Status: PR - 12/13/2017
Well Name/No:GM #323-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date12/13/2017
FacilityID:450238LocationID:334816
County:GARFIELD #045Location:LOT 7 5 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5977 ft.
Basin:PICEANCE BASIN  
Planned Location:690FSL  931 FELLat/Long: 39.460925 / -108.125644Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.460922 / -108.125644Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/16/2017
End Date: 11/17/2017
Reported: 12/12/2017
Days to report: 25
Disclosure: Sidetrack #00
Start Date: 11/29/2017
End Date: 11/30/2017
Reported: 12/12/2017
Days to report: 12
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/13/2017             Measured TD: 7785 ft.    Vertical TD: 6628 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/13/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/4/2019
Proposed Top PZ Location:Sec:5 Twp: 7S 96W Footage: 2023 FSL  1962 FWL
Bottom Hole Location:Sec:5 Twp: 7S 96W Footage: 2044 FSL  1992 FWL
Proposed Depth/Form:7811 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 85 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 142, Top: 0 ft., Bottom: 85 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1153 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 278, Top: 0 ft., Bottom: 1153 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7811 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 603, Top: 4420 ft., Bottom: 7811 ft.

Wellbore Completed
Completion Date:10/17/2017
Spud Date:10/15/2017Spud Date Is:ACTUAL
Measured TD:7785 ft.Measured PB depth:7743 ft.
True Vertical TD:6628 ft.True Vertical PB depth:6586 ft.
Top PZ Location:Sec:5 Twp: 7S 96WFootage: 2023 FSL  1962 FWL
Bottom Hole Location:Sec:5 Twp: 7S 96WFootage: 2044 FSL  1992 FWL
Log Types:CBL/PULSED NEUTRON LOG/TRIPLE COMBO IN 045-22668
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 109 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 182, Top: 0 ft., Bottom: 109 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1274 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 1274 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7785 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 885, Top: 4663 ft., Bottom: 7785 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 4663 ft., Depth: 6130 ft., Bottom: 6222 ft., Sacks: 690, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
WASATCH G2602 ft.
MESAVERDE4683 ft.
OHIO CREEK4683 ft.
WILLIAMS FORK4897 ft.
CAMEO7261 ft.
ROLLINS7673 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/13/2017                Interval Top: 5953 ft.    Interval Bottom: 7598 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/14/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/16/2017Treatment End Date:11/30/2017
Treatment Summary:34619 bbls of slickwater; No Proppant; 780 gals of biocide
Total fluid used in treatment (bbls):34638Max pressure during treatment (psi):5193
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.58
Recycled water used in treatment (bbls):34619Total flowback volume recovered (bbls):8346
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7424 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/13/2017Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1078
CALC_MCF_GAS 2318
CASING_PRESS 1170
MCF_GAS 2318
TUBING_PRESS 1065
Perforation Data:
Interval Top:5953 ft.# Of Holes:216
Interval Bottom:7598 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)40
Total Gas Produced (MCF)26118
GOR652950
GOR DeterminationMCFE
Average BOE per Day12.454
Average MCFE per Day72.230

 Federal Financial Assurance  i Y

 Tribal Well  i No