Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23433
Well Classification: GW Status: PR - 1/9/2018
Well Name/No:Youberg #SR 521-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC36490
Facility Status:PRStatus Date1/9/2018
FacilityID:448498LocationID:324061
County:GARFIELD #045Location:SWNE 12 7S94W 6
Field:RULISON - #75400Elevation:7254 ft.
Basin:PICEANCE BASIN  
Planned Location:1890FNL  2125 FELLat/Long: 39.455421 / -107.833935Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.455421 / -107.833935Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/3/2017
End Date: 8/7/2017
Reported: 8/31/2017
Days to report: 24
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/9/2018             Measured TD: 9522 ft.    Vertical TD: 9302 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/9/2018
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/28/2018
Proposed Top PZ Location:Sec:12 Twp: 7S 94W Footage: 1099 FNL  1815 FWL
Bottom Hole Location:Sec:12 Twp: 7S 94W Footage: 1099 FNL  1815 FWL
Proposed Depth/Form:9554 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-76 , Unit Acreage: 640, Drill Unit: All of Sec. 12
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 23, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 266, Top: 0 ft., Bottom: 1100 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9554 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 869, Top: 4854 ft., Bottom: 9554 ft.

Wellbore Completed
Completion Date:6/29/2017
Spud Date:5/16/2017Spud Date Is:ACTUAL
Measured TD:9522 ft.Measured PB depth:9460 ft.
True Vertical TD:9302 ft.True Vertical PB depth:9240 ft.
Top PZ Location:Sec:12 Twp: 7S 94WFootage: 1092 FNL  1828 FWL
Bottom Hole Location:Sec:12 Twp: 7S 94WFootage: 1127 FNL  1812 FWL
Log Types:CBL/MUD/PULSED NEUTRON/TRIPLE COMBO
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 140, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1140 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1140 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9522 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1050, Top: 4618 ft., Bottom: 9522 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3349 ft.
MESAVERDE5704 ft.
OHIO CREEK5704 ft.
WILLIAMS FORK5870 ft.
CAMEO8620 ft.
ROLLINS9402 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/18/2017                 Interval Top: 7342 ft.    Interval Bottom: 9327 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/18/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/3/2017Treatment End Date:8/7/2017
Treatment Summary:58906 bbls of slickwater; 1149730 100/Mesh; 2930 gals of biocide
Total fluid used in treatment (bbls):58976Max pressure during treatment (psi):8450
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.71
Recycled water used in treatment (bbls):58906Total flowback volume recovered (bbls):15194
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1149730Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9136 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/18/2017Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1063
CALC_MCF_GAS 1175
CASING_PRESS 2800
MCF_GAS 1175
TUBING_PRESS 2350
Perforation Data:
Interval Top:7342 ft.# Of Holes:240
Interval Bottom:9327 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)123
Total Gas Produced (MCF)46205
GOR375650
GOR DeterminationMCFE
Average BOE per Day22.178
Average MCFE per Day128.608

 Federal Financial Assurance  i Y

 Tribal Well  i No