Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23363
Well Classification: GW Status: PR - 10/1/2020
Well Name/No:Puckett #21B-26-697
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2020
FacilityID:448174LocationID:416157
County:GARFIELD #045Location:NWNE 26 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8396 ft.
Basin:PICEANCE BASIN  
Planned Location:842FNL  1425 FELLat/Long: 39.498928 / -108.183106Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.498928 / -108.183106Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/8/2017
End Date: 8/12/2017
Reported: 12/7/2017
Days to report: 117
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/1/2020             Measured TD: 9110 ft.    Vertical TD: 8912 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/1/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/22/2018
Proposed Top PZ Location:Sec:26 Twp: 6S 97W Footage: 232 FNL  2257 FWL
Bottom Hole Location:Sec:26 Twp: 6S 97W Footage: 232 FNL  2257 FWL
Proposed Depth/Form:9141 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-21 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 40# , Citings Type: PLANNED
Cement:Sacks: 829, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9111 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 877, Top: 5156 ft., Bottom: 9111 ft.

Wellbore Completed
Completion Date:5/3/2017
Spud Date:4/27/2017Spud Date Is:ACTUAL
Measured TD:9110 ft.Measured PB depth:9067 ft.
True Vertical TD:8912 ft.True Vertical PB depth:8870 ft.
Top PZ Location:Sec:26 Twp: 6S 97WFootage: 239 FNL  2401 FWL
Bottom Hole Location:Sec:26 Twp: 6S 97WFootage: 269 FNL  2245 FWL
Log Types:CBL, PNL
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2475 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 898, Top: 0 ft., Bottom: 2475 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9102 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 941, Top: 3447 ft., Bottom: 9102 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH4498 ft.4830 ft.NN
FORT UNION4830 ft.6155 ft.NN
OHIO CREEK6155 ft.6360 ft.NN
WILLIAMS FORK6360 ft.8496 ft.NN
CAMEO8496 ft.8951 ft.NN
ROLLINS8951 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/1/2020                 Interval Top: 7159 ft.    Interval Bottom: 8880 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/29/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/8/2017Treatment End Date:8/12/2017
Treatment Summary:Frac'd with 56,147 bbls slickwater and 129 bbls 7.5% HCl acid.
Total fluid used in treatment (bbls):56276Max pressure during treatment (psi):8277
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):129Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):56147Total flowback volume recovered (bbls):21929
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8605 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/29/2017Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2167
BTU_GAS 1037
CALC_BBLS_H2O 2167
CALC_MCF_GAS 346
CASING_PRESS 805
MCF_GAS 346
Perforation Data:
Interval Top:7159 ft.# Of Holes:189
Interval Bottom:8880 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)53
Total Gas Produced (MCF)23151
GOR436811
GOR DeterminationMCFE
Average BOE per Day11.088
Average MCFE per Day64.316

 Federal Financial Assurance  i 

 Tribal Well  i No