Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23361
Well Classification: GW Status: PR - 8/29/2017
Well Name/No:Puckett #31C-26-697
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/29/2017
FacilityID:448172LocationID:416157
County:GARFIELD #045Location:NWNE 26 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8396 ft.
Basin:PICEANCE BASIN  
Planned Location:882FNL  1392 FELLat/Long: 39.498817 / -108.182986Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.498817 / -108.182986Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/16/2017
End Date: 8/18/2017
Reported: 12/7/2017
Days to report: 111
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/29/2017             Measured TD: 9070 ft.    Vertical TD: 9012 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/29/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/22/2018
Proposed Top PZ Location:Sec:26 Twp: 6S 97W Footage: 488 FNL  849 FEL
Bottom Hole Location:Sec:26 Twp: 6S 97W Footage: 488 FNL  849 FEL
Proposed Depth/Form:9050 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-21 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 40# , Citings Type: PLANNED
Cement:Sacks: 829, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9050 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 843, Top: 5228 ft., Bottom: 9050 ft.

Wellbore Completed
Completion Date:3/20/2017
Spud Date:3/15/2017Spud Date Is:ACTUAL
Measured TD:9070 ft.Measured PB depth:9007 ft.
True Vertical TD:9012 ft.True Vertical PB depth:8950 ft.
Top PZ Location:Sec:26 Twp: 6S 97WFootage: 565 FNL  690 FEL
Bottom Hole Location:Sec:26 Twp: 6S 97WFootage: 602 FNL  849 FEL
Log Types:CBL, PNL
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2526 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 883, Top: 0 ft., Bottom: 2526 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9065 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 941, Top: 2605 ft., Bottom: 9065 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH4471 ft.4779 ft.NN
FORT UNION4779 ft.6109 ft.NN
OHIO CREEK6109 ft.6312 ft.NN
WILLIAMS FORK6312 ft.8478 ft.NN
CAMEO8478 ft.8928 ft.NN
ROLLINS8928 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/29/2017                 Interval Top: 7074 ft.    Interval Bottom: 8870 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/29/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/16/2017Treatment End Date:8/18/2017
Treatment Summary:Frac'd with 56,128 bbls slickwater and 131 bbls 7.5% HCl acid.
Total fluid used in treatment (bbls):56259Max pressure during treatment (psi):8445
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):131Min frac gradient (psi/ft):0.47
Recycled water used in treatment (bbls):56128Total flowback volume recovered (bbls):25025
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8442 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/29/2017Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1226
BTU_GAS 1024
CALC_BBLS_H2O 1226
CALC_MCF_GAS 801
CASING_PRESS 730
MCF_GAS 801
Perforation Data:
Interval Top:7074 ft.# Of Holes:192
Interval Bottom:8870 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)92
Total Gas Produced (MCF)35275
GOR383423
GOR DeterminationMCFE
Average BOE per Day16.920
Average MCFE per Day98.137

 Federal Financial Assurance  i 

 Tribal Well  i No